My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1989-10-10_REVISION - M1988112 (19)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1989-10-10_REVISION - M1988112 (19)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2021 6:59:48 AM
Creation date
11/21/2007 5:21:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
10/10/1989
Doc Name
APPENDIX M EMERGENCY RESPONSE PLAN
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I.0 INTRODUCTION <br />• Battle Mountain Resources (BMR) Inc. proposes to develop the San Luis <br />Project from which gold will be produced. Mining and processing activities <br />will take place approximately four miles northeast of the town of San Luis <br />in Costilla County. Lands utilized by the project are privately owned. <br />The ore will be processed through a carbon-in-leach circuit to <br />recover the gold with tailings disposal in a lined disposal area. The <br />disposal area has been designed to contain water from the carbon-in-leach <br />circuit and storm flows from the PMP storm. The carbon-in-leach mill <br />facilities have been designed to provide containment and collection of any <br />spills within the mill building. <br />• <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.