Laserfiche WebLink
NCCI Pif #1, Technical Revision No. 3 Adequacy Review Response Questions, File No. M-2001-107 1/3/2007 <br />-2- <br />amount of recharge in that area and measure the groundwater depths in that area weekly until <br />the groundwater depth has returned to the benchmark level. <br />NCCI will submit the measurements of the groundwater monitoring wells yearly with the annual <br />reclamation report. <br />2. J&T Consulting, Inc. made recommendations for monitoring slope stability at the NCCI pit Please <br />state if the operator intends to fallow the recommendations noted in the Slope Stability Report <br />NCCI intends to follow the recommendations for monitoring the slope stability at the pit per the <br />Slope Stability Report. <br />NCCI appreciates your consideration of these responses to your questions and looks forward to <br />your response, <br />Please feel free to contact me with any questions or comments <br />Sincerely, <br />~~/ .•--~ <br />Toddr~ <br />JBr:T Consulting, Iuc. <br />Cc: Northern Colorado Constructors, Inc. <br />File <br />1400 W 122"' Avenue -Suite 120 • Westminster CO 80234 • Ph: 303.457-0735 • Fax: 303-920-0343 <br />