Laserfiche WebLink
EXHI$IT B <br />PHASE 1 REVISION RECLAMATION PLAN <br />TRI COUNTY GRAVEL <br />PERMIT # M 1977-205 <br />PHASE 1 DAM SITE- <br />TOM CURRY, AND DARYL TURN[PSEED STARTED WORK ON A DAM SITE <br />LOCATED AT THE WEST END OF PHASE 1-SEPTEMBER, 2004. THE DAM <br />WAS PUT IN WITH 2 FRONT END LOADERS. COMPACTION WAS DONE <br />AFTER EACH FOOT LIFT. 12 INCH OUTLET PIPE WITH AN INLINE 10'X 12" <br />AGRI DRAIN CONTROLL OVERFLOW WAS INSTALLED. THE DAM WAS ]0 <br />FEET HIGH AND 100 FEET LONG. SLOPE ON DOWN STREAM SIDE OF DAM IS <br />2:1, AND SLOPE ON UP STREAM IS 4:1. RESERVOIR SURFACE AREA IS 12.5 <br />ACRES, CAPACITY IS 100 ACRE FEET. TAIL WATER DRAINAGE IS FROM <br />TOM CURRY'S WATER RIGHTS. WATER COMMISSIONER STEPHEN TUCK <br />CHECKED THE DAM LOCATION SEPTEMBER 7, 2004. UTILIZING GPS: SET <br />TO UTM DATUM. MEASURE ON CREST OF DAM AT STREAMLINE OUTLET. <br />MEASUREMENTS WERE AS FOLLOWS: NORTHING 4299202 M. EASTING <br />0266055 M.. STEPHEN TUCK WATER COMMISSIONER FROM WATER <br />DIVISION 4 DISTRICT 40 CHECKED THE TAIL WATER SOURCES OWNED BY <br />TOM CURRY TO BE CORRECT ON SEPTEMBER 9, 2004. TAIL WATER <br />SOURCES IN CURRY DAM 1 USED FOR AUGUMENTATION, INDUSTRIAL, <br />RECREATION, FISHERY AND IRRIGATION OWNED BY TOM CURRY ARE AS <br />FOLLOWS: <br />LANGFORD CADDICK 3.25 CPF #DPN G88 <br />SHORT DITCH COMPANY- 40 SHARES #369 <br />TRIBUTARY TO NORTH FORK OF THE GUNNISON RIVER. <br />PAPER ENCLOSED WHERE FRANK J KUGEL DIVISION ENGINEER SIGNED <br />THE CURRY DAM #1 WATER DIVISION 4 IN DISTRICT 40. <br />