Laserfiche WebLink
CIRCES Cost Estimating Software <br />Task # : 001 <br />Date : 05/02l2006 <br />User : RMW <br />State :Colorado PermiUjob# : M-1980-136 <br />County :Eagle Abbreviation :none <br />Site :Chambers Pit Filename : M136-001 <br />Agency or organization name : DMG <br />Permit or other job action :Reclamation costs for TR-02 <br />Task description :Grading highwalls to 3H:1V <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Sedes 11 - 8SU Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $53.92 NA <br />Operating cosUhour : $75.29 100 <br />Ripper op. cosUhour : $1.99 25 <br />Operator cost/hour : $32,53 NA <br />Total unit cosUhour : $163.74 Total fleet cosUhour : $163.74 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 25,000 BCY factor : 1.124 volume: 28,090 LCY <br />Source of estimated volume :2000' of 3N:1V slope <br />Source of estimated swell factor :Cat Handbook Weight of Materials Table, Sand and Gravel <br />HOURLY PRODUCTION <br />Average push distance : 100 feet <br />Unadjusted hourly production : 852fi LCY/hr <br />Matedal consistency description <br />Dry, non-cohesive <br />Average push gradient : 2.00 % (i <br />Average site altitude : 6,520 feet <br />Material weight : 2,900 Ibs/LCY <br />Weight description <br />Sand and oravel - Orv <br />Job Condition Correcflon Factors Source <br />Operator skill : 0.75 (avg.) <br />Material consistency : 0.80 (Cat HB, <br />Dozing method : 1.20 (slot) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (lshifUda~ <br />Spoil pile : 1.00 (doz-oc) <br />Push gradient : 1.05 (Cat H8J <br />Altitude : 1.00 (Cat H8J <br />Material weight : 0.79 (Cat HB) <br />Blade type : 1.00 (S/SU/UJ <br />Net correction : 0.50 <br />Adjusted unit production : 422.65 LCY/hr <br />Adjusted fleet production : 422.65 LCY/hr <br />Fleet size : 1 Dozers) Total job time : 68.48 Hours <br />Unit cost : $0.387 /LCY Total jab cost : x10.882 <br />