My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-05-25_REVISION - M1974069 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1974069
>
2006-05-25_REVISION - M1974069 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:35:55 PM
Creation date
11/21/2007 5:14:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1974069
IBM Index Class Name
Revision
Doc Date
5/25/2006
Doc Name
OSE Approval - Pond 2 Liner
From
Loveland Ready Mix Concrete Inc
To
DMG
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WATER DMSION ONE <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Departrnent of NaRrral Resources <br />810 9°1 Sheet, Suite 200 <br />Greeley, Colorado 80631 <br />Pfrone (970) 352-8712 <br />Fax (970)392-1816 <br />vnvw.water.state.m.us <br />May 5, 2006 <br />Brad Faucher <br />Operations Manager <br />Loveland Ready-Mix Concrete, Inc. <br />P.O. Box 299 <br />Loveland, CO 80539-0299 <br />Re: Lining Test of Pond #2 (East Pond) <br />N''/z, Section 16, T5N, R69W <br />Water Division 1, Water District 4 <br />Case No. 98CW431 <br />Dear Brad: <br />RECEIVED <br />MAY 2 5 2006 <br />Division of Minarela end 6eolgyy <br />~oQ~ <br />Ae~ <br />Y. <br />eTS' <br />Big Owens <br />Governor <br />Russell Geroge <br />Exewdve Director <br />Hal O. Simpson, p.E <br />State Engineer <br />James R. Hall. P.E <br />Division One Engineer <br />The purpose of this letter is to approve the lining of the above referenced gravel pit. This approval is based on <br />the site inspections conducted on January 6 and April 10, 2006 and on the information provided by you under <br />a cover letter dated January 20, 2006. The estimated pit inflows from precipitation and groundwater indipte <br />that this pit has been lined to the aerformance standard referenced in the August 1999 State Engineer <br />Guidelines for Lining Criteria for Gravel Pits. Meeting the performance standard requires that all water <br />inflows and outflows for this pond must be accounted far on a weekly basis. <br />Please call me if you have any questions. <br />Pond#2LovelandReadyMixLineO K.doc <br />` Sincerely, ~-~~ <br />David L. Nettles, P.E. <br />Assistant Division Engineer <br />CC: Fred Renner, Water Commissioner <br />
The URL can be used to link to this page
Your browser does not support the video tag.