PLATTE SAND Sa GRAVEL LLC PAGE Z <br />TECHNICAL REVISION <br />MAY ZO. 2004 <br />it discussed the up gradient and down gradient impacts associated <br />with the slurry wall. As can be seen they say that they would expect <br />to find a two foot increase in the up gradient ground water level and <br />little or no impact along the down gradient side due to the close <br />proximity of the South Platte River. They also say the this will <br />create minimal impacts to the ground water table that can be miti- <br />gated. This water table increase would be along the south side of <br />Sharkey's Lake and the mounding would be contained entirely on the <br />mine site. The report suggests putting a surface ditch along the <br />south side of Sharkey's Lake will alleviate the increased water <br />buildup by diverting the water around the lined area. Platte Sand & <br />Gravel LLC will follow their recommendation. <br />TECHNICAL REVISION #2 <br />Attached are two maps Exhibits F-1 and F-2 showing the location <br />of the slurry wall that will surround Longhorn Lake and the northern <br />part of Sharkey's Lake. We estimate that it will take two years to <br />complete the Longhorn Lake and 5 years for the Sharkey Lake area. <br />Initially the slurry wall will be installed around the Longhorn Lake, <br />it will be stripped and dewatered. Once this is done mining will <br />begin, with some of the material being moved to the processing plant <br />and some will be stockpiled in the Bluff Lake area. The topsoil will <br />be stored on the north end of Bluff Lake for use in reclamation. We <br />expect to use 85.00 acres ! of the Bluff Lake area for these tempo- <br />rary stockpiles. Since these are the first two areas to be mined we <br />feel providing larger scale maps would help when reviewing this <br />Technical Revision. Once these areas are done plans will be made for <br />the remaining lake areas. A Technical Revision(s) will be filed once <br />we know what changes will be needed to update the groundwater impacts <br />and lake configurations for the rest of the mine area. <br />TECHNICAL REVISION #3 <br />A revised bond estimate is attached also, it includes a cost <br />for the slurry wall around Longhorn Lake and the revision to the <br />amount of disturbance necessary to reclaim the site outside the lake <br />areas. <br />A check for $188.00 is attached to cover the Technical Revision <br />fee. If you have any questions please call myself at (303) 274-4474 <br />or Steve O'Brian of Environment, inc., at (303) 423-7297. <br />Respec y su to <br />r <br />Rocky Hoffsctsne. <br />General Manager <br />cc Environment, Znc. <br />File <br />enclosures <br />