My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-10-24_REVISION - M2000002
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000002
>
2001-10-24_REVISION - M2000002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2025 12:51:06 PM
Creation date
11/21/2007 5:07:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000002
IBM Index Class Name
Revision
Doc Date
10/24/2001
Doc Name
TANABE PIT AGREEMENT FOR COMPENSATION MAN MADE STRUCTURE WITHIN 200 FEET
Type & Sequence
TR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I~IIT~D <br />I~OWEIZ Fax: 303 <br />CO 60601 • Telephone:303-fi59-0551 <br />http://www. unitedpower.eom <br />• 1-80D~468-8609 <br />R~ls~t c .' <br />Mr. john Hickman OCT 2 ~; t,;:,1 <br />Lal7arge, Ina <br />11201 Brighton Road <br />Henderson, CO 80640 Division of Minerals and Geology <br />LaFazge Mining Excavation Adjacent to United Power Three-Phase Overhead Electric <br />Aistribution Line on Brighton Road <br />Dear Mr. Hiolozran: <br />United Power staff has considered the request from LaFarge to excavate within 10' of <br />United Power overhead distribution facilities adjacent to their mt. 'n~~g site on Brighton <br />Road, In order to comply with applicable codes and regulations and United Power safety <br />and operational requirements, mining activities must maintain a minimum of 10' fmm all <br />overhead electric distribution lines pazalloling Brighton Boulevard. At pole locations, <br />existing grade must be maintained for the first 10' from each pole; from that point; a 2:1 <br />slope shall extend to a distance of at least 35' from each pole. <br />Just south of the center of the frontage of the property along the eastright-of--way of <br />Brighton Boulevazd, United Power has athree-phase distribution line extending to the <br />southeast. In addition to a service on this pazcel, the line provides electric service to the <br />Greentree Homes construction office for Belle Creek. If all or a portion of the line is to <br />remain, no arming excavation shall be allowed within a minimum of 35' of either side of <br />the line or any of the structures or equipment except guy wires. No excavation shall be <br />allowed within a minimum of 20' of the point which any guy wire anchor rod enters the <br />ground. The intent is to ensure the integrity of the line and provide for all weather access <br />to the line for maintenance. <br />The next pole on Brighton Road to the south of the above line is an overhead guy pole for <br />an overhead communications line that runs along the westerly right-of--way cf Brighton <br />Boulevazd. LaFazge rep:•esentati^cs must contact the owner of the line to verify their <br />protection requirements. <br />T'he next pole on Brighton Road to the south of the above overhead guy pole has a United <br />Power sidewalk guy attached and no construction may occur within a miriltnum of 20' <br />from the point at which the guy wire anchor rod enters the ground. <br />The next two poles to the south are riser poles for the underground dip between the poles <br />constructed by United Power at the request of LaFarge to accommodate your conveyor <br />system. <br /> <br />A Tuuchsmne Energym Partner 7tia a( <br />
The URL can be used to link to this page
Your browser does not support the video tag.