Laserfiche WebLink
i~1 <br />i <br />TABLE OF CONTENTS <br />1 P-~- <br /> Introduction 1 <br />' Field Investigations 2 <br />' Installation of Monitoring Wells <br />h <br />l L <br />i <br />G <br />i 2 <br /> ys <br />ng <br />eop <br />ca <br />ogg 4 <br />' Aquifer Testing 4 <br /> Water Quality Sampling 5 <br />' Hydrogeologic Assessment from Monitoring Well Data b <br /> Conclusions and Recommendations 8 <br />' Credits 10 <br /> References 11 <br /> <br /> Figure 1 - Monitoring Well Location Map (Downgradient of Tailings Facility) <br />' Figure 2 - Monitoring Well M-12 Geologic Log and Construction Details <br /> Figure 3 - Monitoring Well M-13 Geologic Log and Construction Details <br /> Figure 4- Water Level Drawdown Plot, Well M-9 <br /> Figure 5- Water Level Drawdown Plot, Well M-12 <br />' Figure 6- Water Level Drawdown Plot, Well M-13 <br /> Figure 7- Potentiometric Surface Map Below the Tailings Facility <br />' Figure 8- Structural Contour Map of the Base of the M-9 Production Interval <br /> Figure 9- Geologic Cross-Section A-A' <br />1 <br /> Table 1- Well Completion Details <br />t Table 2- Summary of Aquifer Hydraulic Characteristics <br /> Table 3- Monitoring Well Water Level Elevation Data <br /> Table 4- Summary of Cyanide Analyses from Monitoring Wells Below Tailings Facility <br />i <br />1 <br />