Laserfiche WebLink
N 215.000 <br />N 212.500 <br />N 210.000 <br />N 207.500 <br />TP -9 <br />N 205,000 <br />r <br />PERMIT - <br />BOUNDARY <br />1 <br />8400 <br />11 � Tp- f <br />Ij TP -6 <br />TP -8 eJOo <br />TP TP -7 \ <br />BM -10 <br />\� 1 V --I- <br />�A <br />Drz( <br />- W An <br />P b <br />/rte \\ <br />0 <br />8500 <br />C <br />/ 1r -JV <br />esoo <br />TP 17 <br />as J' <br />0 <br />I <br />- TP -32 <br />31 �, -- <br />7 <br />u _ - <br />J lb" - -- ' H. <br />PH-6 <br />TP -19 <br />TP -22 <br />TP -13 <br />6500 <br />TP -21 <br />IM- - <br />-APPROXIMATE CENTER -LINE <br />OF PROPOSED <br />MAIN EMBANKMENT <br />I <br />O I O <br />O O <br />In O <br />O <br />M � <br />LU <br />BH -11 <br />`S <br />PERMIT <br />BOUNDARY <br />—�7 TP -2E <br />PERMIT <br />BOUNDARY <br />uu <br />.el f <br />L <br />NT <br />500 250 0 500 1000 FEET <br />20' CONTOUR INTERVAL <br />ENGINEER <br />61 <br />PERMIT <br />BOUNDARY <br />l� <br />�I1 <br />-8900 <br />i <br />O O <br />O <br />LU W <br />NOTES: <br />1. TEST PITS TP -1 THROUGH TP -27 WERE EXCAVATED DURING JUNE AND <br />JULY 1988. TEST PITS TP -30 THROUGH TP -36 WERE EXCAVATED DURING <br />OCTOBER 1988. TEST PITS TP -28 AND TP -29 DO NOT EXIST. <br />2. BOREHOLES BH -1 THROUGH BH -10 WERE COMPLETED DURING JUNE <br />AND JULY OF 1988. <br />3. BOREHOLE D88 -63 WAS COMPLETED DURING JULY, 1988, AS PART <br />OF THE PIT WALL STABILITY STUDY. <br />4. BOREHOLES BH -12 THROUGH BH -15 WERE COMPLETED DURING <br />SEPTEMBER OF 1989. <br />PREPARED FOR: PREPARED BY: <br />BATTLE MOUNTAIN �T <br />RESOURCES INC. ► <br />SAN LUIS PROJECT STEFFEN ROBERTSON & KIRSTEN (U.S.) <br />Consulting Engineers & Scientists <br />TIRE SCALE 1•• 500' REVISION <br />DRAWING No. <br />TEST PIT AND BOREHOLE <br />LOCATION MAP 14711 -101 ?c. <br />PermlN mbeI `-I�iBS -c�a DESIGNED <br />Class: OPennit nn � <br />Section /Exhibit_: DRAWN uR 8/69 <br />Class�,,r/^R•evision �iP�O <br />CHECKED <br />CI,C _Report ❑HydroOGene21 ^p�,Y�6 t- VU -101 <br />DoCType__ ____ APPROVED ., H.. H.S B/69 <br />i3Applicabon (Coal only) 0 Bond O Enforcement O Inspection APPROVED <br />No. DESCRIPTION BY DATE <br />A ISSUED FOR BID PCHNIF R.D. 4.90 <br />V) 1 ISSUED FOR CONSTRUCTION K. P. 7190 <br />n 2 AS -BUILT RD 1191 <br />IINi'IlilllliiillCl� IIIIIIUIIVIiuII <br />0 0 0 1 2 2 7 8 <br />