My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-09-22_REVISION - M1977305
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977305
>
2005-09-22_REVISION - M1977305
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:43 AM
Creation date
11/21/2007 5:03:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977305
IBM Index Class Name
Revision
Doc Date
9/22/2005
Doc Name
Financial Warranty Review
From
DMG
To
Cotter Corporation
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />Task # : 03a <br />Date : 09/22/2005 <br />User : GRM <br />State :Colorado PermiUjob# : M-1977-305 <br />County:Monfrose Abbreviation :none <br />Site:Clp-21 Mine Filename:M305-03a <br />Agency or organization name :DMG <br />Permit or other job action :Reclamation Estimate <br />Task description :grade waste rOCk <br />HOURLY EQUIPMENT COST <br />to 3:1 <br />Basic machine :Cat D7R Series !! LGP - 7S Horsepower : 240 <br />Blade type :Straight <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $43.88 NA <br />Operating cost/hour : $53.09 100 <br />Ripper op.oosUhour : $1.49 25 <br />Operator cost/hour : $31.78 NA <br />Total unit cosUhour : $130.24 Total fleet cost/hour : $130.24 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 2,000 CCY factor : 1.215 volume: 2,430 LCY <br /> <br />Source of estimated volume :estimate based on site visit <br />Source of estimated swell factor :program <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 50 feet <br />Unadjusted hourly production : 800.0 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 16.50 % (i <br />Average site altitude : 6,400 feet <br />Material weight : 3,300 Ibs/LCY <br />Weight description <br />Decomposed rock- 75% Rock, 25% Earth <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />0.75 <br />1.00 <br />1.00 <br />1.00 <br />0.83 <br />0.80 <br />1.36 <br />1.00 <br />0.70 <br />1.00 <br />0.47 <br />37719 <br />377.19 <br />LCY/hr <br />LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 6.44 Hours <br />Unit cost : $0.345 /LCY Total job cost : $839 <br />2005 Restart <br />
The URL can be used to link to this page
Your browser does not support the video tag.