My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-09-22_REVISION - M1977305
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977305
>
2005-09-22_REVISION - M1977305
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:43 AM
Creation date
11/21/2007 5:03:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977305
IBM Index Class Name
Revision
Doc Date
9/22/2005
Doc Name
Financial Warranty Review
From
DMG
To
Cotter Corporation
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />Date : 22-Sep-2005 Permit or job no.: M-1977-305 Site :C/p-21 Mine <br />User; GRM Abbreviation: none State :Colorado <br />Filename : M305-000 County :Montrose <br />Agency or organization name :DMG <br />Permit or job action :Reclamation Estimate - 2005 Restart <br />TASK LIST (DIRECT COSTSI FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />Ofa -demolish and remove mine structures and debris demolish 1 24.0 $5,667 <br />02a -portal and vent closures minesea/ 1 40.0 $13,723 <br />03a -grade waste rock pile dozer 1 6.4 $839 <br />04a rip and grade compacted areas dozer 1 9.6 $1,277 <br />05a -replace topsoil over 4 acres dozer 1 16.1 $2,102 <br />06a -revegetationof4acres revege 1 24.0 $4,810 <br />07a -initial mobilization mobilize 4 5.0 $1,286 <br />08a -secondary seeding mobilization mobilize 1 4.4 $451 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS: 129.6 $30,155 <br />` inUUdes inflation factor adjustment of : NA % TOTAL DIRECT COST' _ $30.156 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT • Llabllity 1nSDfanCe : 2.02 % of direct total = $609 <br />Performance bond : 1.05 % of direct total = $317 <br />Job superintendent : NA' NA NA total = NA <br />Profit : 10.00 % of direct total = $3,016 <br />' not required (or eqp. operator serves as super) TOTAL O & P = $3, 941 <br />LEGAL•ENGINEERING -PROJECT MANAGEMENT- CONTRACT AMOUNT (direU+O&P)= $34,097 <br />Financial warranty processing (legal/related costs) : total = <br />Engineering work and/or contracUbid preparation : NA NA NA total = NA <br />Reclamation management andlor administration : 5.00 % of cntr. NA total = $1,705 <br />CONTINGENCY- NA" NA total= NA <br />'contingencies accounfetl Por at task level TOTAL INDIRECT COST= $5,646 <br />TOTAL BOND AMOUNT (direct + indirect) _ $35,802 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.