My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-04-24_REVISION - M1977347
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977347
>
2003-04-24_REVISION - M1977347
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:56:55 PM
Creation date
11/21/2007 5:03:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977347
IBM Index Class Name
Revision
Doc Date
4/24/2003
Doc Name
Incomplete TR
From
DMG
To
Holnam Inc. - Ft Collins Plant
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Na[ural Resources <br />1313 Sherman S[., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />Apri124, 2003 / <br />DIVISION O F <br />MINERALS <br />GEOLOGY <br />RECLAMATION <br />MINING•SAFETY <br />Bill Owens <br />Mr. Gorden Benton covemor <br />ProJeCL Managef Greg E. watcher <br />Hohuun, Inc. - Ft. Collins Plant / Executive Director <br />P.O. BOX 1548 Ronald W. Cattany <br />Division Director <br />LaPorte, CO 80535-1548 <br />/ / / <br />Re: Slab Canyon Quarry, Permit No. M-1977-347, Incomplete Technical Revision No. TR-1, Technical <br />Revision Fee Request, Request for Performance Warranty for Succession of Operators, 50-2 <br />Dear Mr. Benton: <br />On Mazch 5, 2003, the Division of Minerals and Geology received a request for a Technical Revision form Holcim (US) <br />Inc. for the Slab Capon Quarry, Permit No. M-1977-347. This sight is still permitted by Hohulm, h1c. - Fk Collins Plant <br />and the Division cannot accept the Technical Revision in the name of Holcim (US), Inc. until the permit transfer <br />(Succession of Operators) is completed. The following items must be submitted to the Division to complete the <br />Succession of Operators and the Technical Revision: <br />1). Succession of Operators: Please submit a fully executed Performance Warranty (farm enclosed) in the <br />name of Holcim ([JS) Inc. This will complete the Succession of Operators application. The Division <br />had asked Mr. Roy Stienmier on August 5, 2002 to submit a Performance Warranty (seeAugust 5, 2002 <br />letter to Mr. Stienmier) but he mover submitted one. <br />2). Technical Revision: The Division received $150.00 application fee for the Technical Revision. The <br />correct fee for a Construction Material operation is $188.00 (see fee list enclosed). Please submit an <br />additional $38.00 for the Technical Revision fee. The Division also received one copy of the Technical <br />Revision request. Please see DMG Bulletin -May 3, 2002, Minerals Permit and Amendment <br />Application Submittals. All Operators must provide two copies of Technical Revisions to the Division <br />When the Succession of Operators application is approved and completed and the additional material and Fee for the <br />`fe3tevisiolrarereceivad the Divisional thenprocessthe~ectmicatRcvision. ~fyou~lave arty questions; please <br />do not hesitate to call me at (303) 866-4074. <br />Sincerely, <br />Bazbaza D. Chiappone <br />Minerals Division Program Assistant II <br />Enclosures <br />
The URL can be used to link to this page
Your browser does not support the video tag.