My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1992-05-26_REVISION - M1974052
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1974052
>
1992-05-26_REVISION - M1974052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2023 7:08:01 PM
Creation date
11/21/2007 5:02:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1974052
IBM Index Class Name
Revision
Doc Date
5/26/1992
Doc Name
PIT 1 FN M-74-052 AMENDMENT APPLICATION
From
CHENOWETH & ASSOCIATES
To
MLRD
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' EXHIBIT G - WATER INFORMATION <br /> Each mining phase will be dewatered prior to excavation <br /> commencement . <br /> The St . Vrain 100-year floodplain covers 90% of the permit area as <br /> shown on the Pre-Mining Map . The floodplain limits were obtained <br /> from Mr . William Stanton of the Colorado Water Conservation Board <br /> as delineated by Kucera and Associates . The site will be <br /> adequately graded to insure proper drainage from the site . <br /> Three culverts will be installed between the ponds to allow proper <br /> drainage and ground water flow of the site . See Reclamation Plan <br /> Map for locations . <br /> ' Water requirements for the proposed operation include 2 , 000 gallons <br /> per day for haul roads dust suppression. Based on operating 200 <br /> ' days per year , the requirement will be approximately 1 . 2 acre- feet <br /> per year . <br /> There will be no gravel processing on site during Phases I and II . <br /> ' Materials will be excavated and hauled to the adjacent plant site . <br /> A portable crusher may be set up at a later date , as shown on the <br /> Mining Plan Map for Phases III , IV, V, and VI . For the entire <br /> ' operation, any water requirements will be supplied from the well <br /> on the adjacent pit . <br /> ' Permitted wells in the area are shown on Figure G- 1 and listed on <br /> the following Table G- l . These wells are not expected to be <br /> affected by operations . <br /> ' Discharge from dewatering the site will be monitored in accordance <br /> with the discharge permit to be obtained by the operator . <br /> Discharge will flow into the existing drainages at the locations <br /> shown on the Mining Plan Map. Riprap spillways will be installed <br /> at the dewatering discharge locations . After Phases I and II are <br /> dewatered , the pump will be relocated for dewatering the remaining <br /> ' phases . Both of the existing drainages are capable of handling the <br /> water to be discharged . <br /> G- 1 <br /> 1 <br />