Laserfiche WebLink
STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br />1313 Sherman Street, Room 818 <br />Denver, Colorado 80203 <br />Phone (303) 866-3581 <br />FAX (303) 866-3589 <br />wnwv.wa[ees[a[e.co. us <br />r~4`".i" s~A~PT <br />APh 2 ~ 2C05 <br />of cow <br />„Fi <br />+ ~ <br />~s <br />r /876 ~ <br />Response to Reclamation Permit Application Consideration <br />DATE: April 25, 2005 <br />TO: Thomas A. Schreiner, Environmental Protection Specialist <br />CC: Division 1 Office, District 5 Water Commissioner <br />FROM: loans Comaniciu, E.I.T. / <br />RE: Phillips Stone Company, File No. M-1981-07,5/-AM1 <br />Operator: Phillips Stone Company <br />Contact: Cheri Vandergrift-303-271-0222 <br />Section 5, Twp 3 North, Rng 70 West, 6th P.M., Boulder County <br />Bill Owens <br />Governor <br />Russell George <br />Executive Director <br />Hal D. Simpson, P.E. <br />State Engineer <br />CONDITIONS FOR APPROVAL <br />® The proposed amendment to the existing operation does not anticipate exposing groundwater. <br />Therefore, exposure of ground water must not occur during or after mining operations. The purpose of <br />this amendment is to increase the permitted mining area from 3 acres to 9.9 acres. <br />^ The proposed operation will consume ground water by: ^ evaporation, ^ dust control, ^reclamation, <br />^ water removed in the mined product, ^ processing, ^ other: <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit or <br />other type of well permit, as applicable. However, prior to obtaining a permit, an approved water supply <br />plan or decreed plan for augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and document <br />the locations of all wells within 600 feet of the permit area. The applicant must then obtain a waiver of <br />objection from all well owners with wells within 600 feet of the permit area or request a hearing before <br />the State Engineer. <br />^ The proposed operation may have potential impact on existing water rights near the project location. <br />Applicant needs to demonstrate that the proposed project will not alter or impact the historic operation of <br />existing water rights. <br />^ The applicant has indicated plans to use other water for purposes at the permit site. The source <br />of water for this use is to be obtained from Applicant needs to document that this water was <br />diverted in priority under a water right decreed for such industrial use. Applicant should contact the <br />water commissioner for further information. <br />® The applicant has not identified any proposed use of water at the permit site. If water will be used for <br />any purpose at this site, the applicant will need to document that the water was obtained from a legal <br />source, or the water was diverted in priority under a water right decreed for such industrial use. <br />COMMENTS: If stormwater runoff is intercepted by this operation and is not diverted or captured in priority, it <br />must be released to the stream system within 72 hours. This may require a discharge permit from CDPHE- <br />WOCD. Otherwise, the operator will need to make replacements for evaporation. <br />The applicant may contact the State Engineer's Office with any questions. <br />