My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-06-05_REVISION - M1981302 (10)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981302
>
1997-06-05_REVISION - M1981302 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2022 4:18:01 PM
Creation date
11/21/2007 4:58:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981302
IBM Index Class Name
Revision
Doc Date
6/5/1997
Doc Name
PRE-HEARING STATEMENT OF INTERESTED PARTY OBJECTOR BOARD OF CNTY COMMISSIONERS OF BOULDER CNTY
Type & Sequence
AM2
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III 999 � <br /> RECEIVED <br /> BEFORE THE MINED LAND RECLAMATION BOARD JUN 0 5 1997 <br /> STATE OF COLORADO Division of Minerals& Geology <br /> File No. M-81-302 <br /> PRE-SEARING STATEMENT OF INTERESTED PARTY (OBJECTOR) BOARD OF <br /> COUNTY COMMISSIONERS OF THE COUNTY OF BOULDER <br /> IN THE MATTER OF THE WESTERN MOBILE - DEEPE FARM PIT - AMENDMENT <br /> 02 <br /> The Board of County Commissioners of the County of Boulder (BOCC) <br /> submits this pre-hearing statement for the pre-hearing conference . <br /> scheduled in this matter for June 5, 1997. By this statement, <br /> the BOCC expresses its wish and intention to be an objecting <br /> party before the MLRB at the hearing scheduled on this amendment <br /> application for June 25 or 26, 1997. <br /> Party's Name: Board of County Commissioners of the County of <br /> Boulder (BOCC) . <br /> List of Witnesses: The BOCC anticipates presenting testimony to <br /> the MLRB through its authorized staff in this matter, who are <br /> expected to include the following: <br /> 1. Curt Parker, Floodplain Engineer, Boulder County <br /> Transportation Department, who is expected to testify concerning <br /> the content and significance of the ongoing Urban Drainage and <br /> Flood Control District (UDFCD) study of the South Boulder Creek <br /> Floodplain in the vicinity of the Deepe Farm Pit, and the <br /> advisability of the MLRB denying the proposed amendment until <br /> that study is complete, or imposing a condition on any approval <br /> which would require the Applicant Western Mobile to take <br /> appropriate flood mitigation measures within the permit area (and <br /> including the berm) once the study's results are available. Mr. <br /> Parker also is expected to testify concerning the flood control <br /> significance of the berm and recent structural modifications to <br /> the berm, as a basis for the County's argument that the berm is <br /> properly part of this amendment and should not be separately <br /> reviewed as a technical revision. Mr. Parker also may testify to <br /> the flood control implications of the other internal drainage <br /> changes associated with this amendment. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.