Laserfiche WebLink
(Table Continued) <br /> Unit Cost Cost <br />Aspect Reclamation Operation uantit Units ($) ($) <br />G. Settling Basin <br /> 1. Will fill with groundwater <br />H. Access Road <br /> 1. To remain following reclamation <br />I. Topsoil and Overburden Stockpiles <br /> 1. .Material removed for other <br /> Aspects <br /> 2. Seed and mulch 1.5 Ac 800 1,200 <br /> 3. Reseed 20% 0.3 Ac 800 240 <br />J. Employee Facilities and Maintenance <br /> Station <br /> 1. Scazify compacted ground 0.5 Ac 50 25 <br /> 2. Replace topsoil, 6" x 0.5 acres 400 CY 1.25 500 <br /> 3. Seed and mulch 0.5 Ac 800 400 <br /> 4. Reseed 20% 0.5 Ac 800 400 <br />K. Asphalt, Concrete and Processing <br /> Plants <br /> 1. Remove electrical lines (any 1 L.S. 2000 2000 <br /> foundations remaining will be <br /> under water) <br />Total Disturbance Costs 201,072 <br />Contractor Mobilization/Demobilization (8%) 0.08 16,086 <br />Overhead (18.5%) 0.185 40,174 <br />Administration (5% 0.05 12,867 <br />Total Pro osed Financial Warran 270,199 <br />Disturbed Acreage 37 <br />Financial Warranty per Acre 7,303 <br />River Vo!!ey Resource <br />DMC 1 /2 Permit Amendment <br />Page 20 <br />