Laserfiche WebLink
Cobny Shale Oil Project, Colorado MLRB Permit M-80.047 December 73, 3006 <br />2006 AffeCed Area Status Summary and Request for Reduction in Affected Acreage <br />,® <br />• <br />• <br />Table of Contents Page <br />1.0 Introduction and Purpose of this Submittal .................................................. 1 <br />2.0 Background ............................................................................................. 1 <br />3.0 Purpose of this Submittal ....................................................................... 3 <br />4.0 Area by Area Discussion ...................................................................... 4 <br /> 4.1 Parachute Properties Land Use Clarification .......................................... 4 <br /> 4.1.1 Intake Site * ....................................................................... 4 <br /> 4.1.2 Parachute Terminal Facilities' ................................................. 5 <br /> 4.2 Resource Block Reclaimed Areas ................................................. 7 <br /> 4.2.1 Area 6, Mine Bench ......................................................... 7 <br /> 4.2.2 Area 7, Upper Middle Fork ................................................ 7 <br /> 4.2.3 Area 16B, Construction Water Pipeline to LaSal Laydown Area ...... 11 <br /> 4.2.4 Area 17C, Surface Conveyor Disturbance ............................ 12 <br /> 4.2.5 Area 17B, Guard Pond Disturbance and Construction Water Pipeline.. 13 <br /> 4.2.6 Area 18A, Switchyard fill ................................................. 14 <br /> 4.2.7 Area 186, South Valley Fill Face ....................................... 15 <br /> 4.3 Site Access Roads .............................................................. 15 <br />4.3.1 Off-site Access Roads (ISP Area 3)' ...................................... 16 <br />4.3.2 On-site Access Roads (ISP Areas 4, 5, 8, 10, 11, 13 and 19) ......... 20 <br />4.3.2.1 Area 4, Colony Gate to Lab/Office Complex * .................... 20 <br />4.3.2.2 Area 5A, Lab/Office Complex to Reclaimed Tosco Retort Site * 21 <br />4.3.2.3 Area 8A, Dam Access Road ' ....................................... 23 <br />4.3.2.4 Area 10, Davis Gulch Road * ....................................... ZS <br />4.3.2.5 Area 11, Firebreak Road * .......................................... 27 <br />4.32.6 Area 13, West Road ' .................................................. 28 <br />4.3.2.7 Area 19, Plant Access Road * ................................... 30 <br />5.0 Summary and Conclusion .................................................................. 35 <br />Tables Table 1 Affected Acreage Status, 1982 ISP to Present ............................ 36 <br />Appendix A: Drawings and Maps, Exhibits F-1 through F-10 <br />Appendix 8: Excerpts from Applicable Reclamation Plans fro original permit application and from <br />applicable amendment applications. <br />Areas marked with an asterisk "*" are permanent roads for which apost-mining land use change or <br />clarification is included herewith, but in other portions of these areas reclamation in accordance with the <br />approved reclamation plan has been completed. <br />