Laserfiche WebLink
STATE OF COLORADO <br />DIV1510N OF MINERALS AND GEOLOGY v <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866.3567 <br />FAX: (303) 832$106 ~~ y <br />February 23, 2005 <br />Mr. Tavis Rogers / <br />Climax Molybdenum Company/ <br />COLORADO <br />DIVISION O F <br />MINERALS <br />GEOLOGY <br />RELLANATION•NINING <br />SAFETY•SCIENCF <br />Bill Owens <br />Governor <br />Russell George <br />Executive Director <br />C1m1aX Mme Ronald W. Cattany <br />Division Director <br />Clunax, CO 80429 ~ Natural Resource Trustee <br />RE: Mayflower Acid Dosing Station Certification Acceptance, Climax Mine Environmental <br />Protection Facility, Technical Revision TR-07/, Permit No. M-1977-493 ~~ <br />v <br />Deaz Mr. Rogers: <br />The Division of Minerals and Geology (DMG) has reviewed your letter dated February 15, 2005. This <br />letter certifies that the upgrades to the Mayflower Acid Dosing Station have been completed in <br />accordance with the plans submitted to DMG at the end of July 2004, with two minor changes as <br />described in your letter. The certification provided meets the requirements of Rule 7.3 of the Mineral <br />Rules and Regulations of the Mined Land Reclamation Boazd. In accordance with Rules 7.3.1(5) and <br />7.3.2(3), the DMG hereby accepts the certification of the upgraded Mayflower Acid Dosing Station. <br />With this acceptance, Climax may put the upgraded stafion into service. Your letter mentions test <br />results for integrity testing of the acid tank, but no documentation of these test results was included <br />with the letter. As a condition of this certification acceptance, copies of the tank integrity test results <br />and the as-built drawings for the upgraded station must be provided to DMG by April 15, 2005. If any <br />problems develop with the meeting of this deadline, please contact me in advance. DMG would like to <br />take this opportunity to congratulate Climax on the successful construction of this substantially <br />upgraded Environmental Protection Facility. <br />Sincerely, <br />~~~~ <br />Allen C. Sorenson <br />Reclamation Specialist <br />cc: Cazl Mount, DMG (via entail) <br />Bryce Romig, Climax (via email) <br />Jeff Todd, Todd Consulting (via email) <br />c:tacs\LOANER MACHINE\My Documentsklimaxacfd sta cert accept.doc <br />__ Office of ~ _ __ _ ._ ._ Office of _ Colorado. _. <br />Mined Land Reclamation Active and Inactive Mines Geological Survey <br />