My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_REVISION - M1980244 (27)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
_REVISION - M1980244 (27)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 8:07:23 AM
Creation date
11/21/2007 4:54:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Name
Apeendix B-1 Photograph Log
From
Cripple Creek & Victor Gold
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Golder <br />Associates <br />January 21, 2003 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, CO 80860 <br />Golder Associates Inc. <br />44 Union Boulevazd, Suite 300 <br />Lakewood, CO 80228 <br />(303)980-0450 <br />(303)985-2080 <br />Golder Project No.: 003-2203 <br />RE: Summary No. 8: January 5 through January 18, 2003 <br />Cresson Project Phase IVb, c Construction Quality Assurance <br />Deaz Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase IVb and c Construction <br />• Quality Assurance (CQA) services performed for the Cresson Project during the period of January 5`n <br />through January 18a'. 2003. <br />The weather during this reporting period was clear to cloudy. Approximate daytime low <br />temperatures ranged from 4° F to 23° F, and highs ranged from 28° F to 53° F. No precipitation was <br />recorded during this reporting period. Weather observations were made on nine days of this two <br />week reporting period. <br />Construction Svnoosis <br />Ames Construction Ina (Ames) of Aurora, Colorado is the earthworks contractor for the Phase fVb and <br />c construction. Ames conducted Phase IVb and c construction activities on nine days of this fourteen <br />day reporting period (January 5th through January 18'n). <br />Construction activities conducted during this reporting period are shown in site maps of Phase IVb and <br />IVc, located in Attachment A. <br />Phase IVb <br />Ames continued placement of Low Volume Solution Collection piping. Ames placed 4-inch slotted <br />PCPE pipe in the locations defined by the plan drawings. Placement of the piping layout will continue <br />as placement of the LV SCF material progresses to the east. <br />
The URL can be used to link to this page
Your browser does not support the video tag.