Laserfiche WebLink
APPENDIX B-I <br />PHOTOGRAPH LOG <br />Photo <br />Number <br />Date <br />Descri lion <br />1 Se tember 2002 General site grading and Structural Fill lacement. <br />2 Aril 2002 Cemented rockfill lacement in UG-494. <br />3 March 2002 Cement ca at UG-494. <br />4 August 2002 Leak detection trench construction. <br />5 September 2002 Soil Liner Fill lacement. <br />6 September 2002 West PSSA end berm construction. <br />7 Se tember 2002 Phase III ore slope contouring. <br />8 October 2002 Bedding Fill placement. <br />9 Se tember 2002 Nuclear density testing of Soil Liner Fill. <br />10 Se tember 2002 Lower geomembrane liner deployment. <br />l 1 October 2002 Extrusion welding. <br />12 Au ust 2002 Geomembrane vacuum testing. <br />13 January 2003 Lined LVSC sump. <br />14 January 2003 LVSC riser trench <br />15 December 2002 Placement ofLow Volume Solution Collection Fill. <br />16 Aril 2003 U er eomembrane 1'mer de to ment <br />17 May 2003 Drain Cover Fill placement <br />18 June 2003 Riser construction <br />June 2003 <br />Golder Associates <br />003-2203.7 <br />1.\pOIOBS\003-2303`.Tak> Cert Repon\PhazeN PSSA Cert~lppmAicirs'Uppendix B PhorogmpNC Log\BI Plpmgaphic DxummuumUppendix HI Phowgapltic LaQ xlsApprndix B-1 <br />