My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-08-31_REVISION - M1977301
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977301
>
2004-08-31_REVISION - M1977301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:21:20 PM
Creation date
11/21/2007 4:54:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977301
IBM Index Class Name
Revision
Doc Date
8/31/2004
Doc Name
Adequacy Ltr
From
DMG
To
Pete Lien & Sons Inc
Type & Sequence
TR4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />fAX: (303) 832-8106 <br />August 31, 2004 `~ <br />Scott Landguth / <br />Pete Lien & Sons, Inc. <br />P.O. Box 440 <br />Rapid City, SD 57709 <br />- - -RE: Pete Lien & Sons, Inc., Roberts Quarry; Pem3it No. M-1977-301 <br />TR-04; Adequacy Letter <br />Dear Mr. Landguth, <br />COLORADO <br />DIVISION O F <br />MIN SRALS <br />GEOLOGY <br />REC LAMATION•MINING <br />SAFETW SCIENCE <br />Bill Owens <br />Governor <br />Russell George <br />Executive Director <br />Ronald W. Cottony <br />Division Director <br />Natural Resource Trustee <br />The Division received Technical Revision (TR-04) for the Roberts Quarry, Permit No. M-1977-301 <br />operated by Pete Lien & Sons, Inc. The revision was submitted as a result of the Division's <br />inspection of May 28, 2004. The revision involves the description and location of the new <br />overburden stockpile noted as stockpile area D. <br />Pete Lien & Sons estimates that stockpile azea D contains approximately 900,000 to 1,000,000 tons <br />of overburden material. Please inform the Division as to how stockpile D will be reclaimed. <br />Specifically, please inform the Division where this material will be placed at the Roberts quarry for <br />final reclamation of the site. The Division will ultimately recalculate the estimated cost to reclaim <br />the quarry based on the location, haul distance and grade of material to be backfilled into the quarry. <br />Please be advised that Division's decision due date is set for September 11, 2004. If you feel more <br />time is needed to complete your reply, the Division can grant an extension to the decision date. This <br />will be done upon receipt of a written waiver of your right to a decision by September 11, 2004 and <br />request for additional time. This must be received no later than the deadline date. If you have any <br />questions, please contact me at (303) 866-4943. <br />Sinc ly, <br />y ~~~ . <br />'Erica S. Crosb <br />Environmental Protection Speclahst <br />cc: Carl Mount; DMG (via electronic transmission) <br />Office of Office of Colorado <br />Mined Land Reclamation Active and Inactive Mines Geological Survey <br />
The URL can be used to link to this page
Your browser does not support the video tag.