Laserfiche WebLink
Agency or organization name ; DRMS <br />Permit or other job action :TR-1 Recalculation <br />Task description :Grade waste dur <br />HOURLY EQUIPMENT COST <br />portal, and ore areas <br /> Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $72.92 NA <br /> Operating cost/hour : $98.84 100 <br /> Ripper op. cosUhour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cosUhour : $204.53 Total fleet cost/hour : $204.53 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 3,300 CCY factor : 1.215 volume : 4,010 LCY <br /> <br />Source of estimated volume :reclamation maps <br />Source of estimated swell factor :na <br /> <br />HOURLY PRODUCTION ~ Job Condition Correction Factors Source <br />Average push distance : 100 feet <br />Unadjusted hourly productlon : 1,243.2 LCY/hr <br />Material consistency description <br />Partly consolidated stockpile <br />Average push gradient : 5.00 <br />Average site altitude : 5,800 fe <br />Material weight : 3,300 Ibs/LCY <br />Weight description <br />Decomposed rock - 75% Rock, 25% Earth <br />Operator skill : 0.75 <br />Material consistency : 1.10 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 0.90 <br />Altitude : 1.00 <br />Material weight : 0.70 <br />Blade type : 1.00 <br />Net correction : 0.34 <br />Adjusted unit production <br />Adjusted fleet production <br />(Cat <br />HB) <br />428.72 LCY/hr <br />428.72 LCY/hr <br />JOB TIME AND COST <br />.Fleet size : 1 Dozers) Total job time : 9.35 Hours <br />Unit cost : $0.477 /LCY 7otaf job cost : $1,913 <br />