Laserfiche WebLink
1 • Exhibit Page 21 • <br /> EXHIBIT L - RECLAMATION COSTS <br /> I ' The estimated reclamation costs for this plan are as follows: <br /> ' 1 . Task 2. Cost/ 3. Total 4. Total 5. Planning 6. Remarks <br /> acre acres cost cost <br /> = 2x3 =4x1.15 <br /> Backfilling 900 <br /> Grading and contouring 420 <br /> ' Reve etation 480 <br /> CURRENT 1,800 9.9 $17,820 20,493 <br /> Assumptions: <br /> ' Materials will be adjacent to highwalls ranging in height from 35-50 feet. <br /> Slopes will be 2:1 or gentler and a steep natural face will be left on the north edges, <br /> consistant with existing (pre-mining) topography. <br /> t All recoverable gypsum will be extracted. <br /> Average 11,000 CY per acre of backfill (overburden). <br /> D-8N bulldozer, $110/hr with operator. <br /> Average push distance: 100 feet: D-8N performance 900 CY/Hr. <br /> These figures represent present costs using existing equipment owned by Colorado Lien <br /> Company, or contracting out the work. <br /> ' The portion of the backfilling associated with stripping has not been included, as the cost <br /> would not be incurred if the stripping was not done. <br /> 1 <br /> I ' I <br /> ' Colorado Lien Company 16.10.95 <br /> 112 Permit Conversion Application: Munroe Quarry CL-MQ-AP-11-D01-0995 <br />