My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-07-08_REVISION - M1997089
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997089
>
2002-07-08_REVISION - M1997089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:42:28 PM
Creation date
11/21/2007 4:44:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997089
IBM Index Class Name
Revision
Doc Date
7/8/2002
Doc Name
Second Adequacy Response
From
Grand Junction Pipe & Supply Company
To
DMG
Type & Sequence
AM3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~~~~i~~ <br />°~~-so, ~ ~f?~ ~ - <br />~,,y~~@~d~s <br />Grand Junction Pipe & Supply Coany ~ <br />AN EQUAL OPPORTUNITY EMPLOYER <br />2868 I-70 Business Loop • P.O. Box 1849 • Grand Junction, Colorado 81502 • 970/243-4604 • FAX 970/241-6622 <br />July 8, 2002 <br />DENVEF$ I~~c <br />~~~ <br />Steve Shuey JUL 0 ~ '"~ <br />Division of Minerals and Geology '~ <br />101 South Third Street, Room 301 Grand Juncrlon Fled o!tlce <br />Grand Junction, CO 81501 Division of Minerels & Geology <br />/ "~ ~/ <br />RE: 23 Road Pit, Permit No. M-1997-089, AM-03, Second Adequacy Response <br />Dear Mr. Shuey: <br />The following is in response to your second adequacy letter dated Tune 25, 2002. <br />8. The application has been revised to indicate an increase of 52 acres and a total of 119.5 <br />acres. <br />9. See Amendment No. 2 for a weed control plan. We have been spraying weed twice a <br />year and will continue to do so on the azea added to the Permit. <br />Backfilling will be done in a dry pit. The present plan is to dewater the pond on the <br />East side of 23 Road and the small pond on the west side while mining phases II and <br />III. The pump inlet will be screened. <br />We are presently in the process of installing secondary containment for the smaller <br />tanks. Secondary containmeni for larger tanks will be lined. <br />The notification of hazardous material spill memo will be included in the Mining Plan. <br />11. If the lakes cannot be connected without dewatering, we will commit to setting up <br />and maintaining a sprinkler system to water the cottonwood trees until the lake has <br />refilled. This method has worked at other pits in the past. <br />24, We will commit to the replacement of three cottonwood trees for everyone mature <br />tree lost as a result of the mining operation. This will include wire wrapping and <br />watering of the trees. <br />Bluebunch wheatgrass, western wheatgrass and needle-and-thread grass will be used <br />in the place of crested wheatgrass. The NRCS will be consulted to determine seeding <br />rates and planting methods. <br />27. Enclosed please find Warranty Deed and Quit Claim Deed conveying the property <br />and mineral rights to Ronald and Marie Tipping. <br />
The URL can be used to link to this page
Your browser does not support the video tag.