Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depamnent of Natural Resources <br />1313 Sherman St, Roan 215 <br />Denver, Colorado 80203 <br />Phone: (303) 8663567 <br />FAX: (303) 832$106 <br />June 22, 2006 <br />Ms. Jodi Villa, P.E. <br />Project Manager <br />143 Union Boulevard <br />Suite 600 <br />Lakewood, CO 80228 <br />RE: Siegrist Construction Coml <br />Permit No. M-1982-015; <br />Extension <br />Deaz Ms. Villa, <br />The Division has received the al <br />(May 23, 2006). Based on the D. <br />that the proposed changes to the <br />enough to constitute an amends <br />March 29, 2006. The Division c <br />of the St. Vrain River to be a suh <br />application. <br />COLORADO <br />DIVISION O F <br />MIN SRALS <br />GEOLOGY <br />0.FC LANATION•NINING <br />SAEETT•SCIENCE <br />elil OWtl13 <br />G01/erfl0f <br />Russell George <br />Executive DileRa <br />Ronald w. campy <br />Division Director <br />Natursl Resource Trustee <br />lany, Amendment to Current Amendment 112 Application, <br />Clarification Information Requirements and Decision Date <br />mt's response (June 12, 2006) to our initial adequacy review <br />m's review of the materials submitted, it is our determination <br />finally proposed reclamation plan are, at this time, significant <br />to the application originally submitted for consideration on <br />less the proposed installation of riprap along the entire reach <br />ial enough change to constitute an amendment to the original <br />As a result of the meeting held on June 22, 2006 (list of attendees enclosed), the Division has <br />agreed to afford the applicant the opportunity to clarify the adequacy review responses received by <br />the Division on June 12, 2006. The clarifications may or may not change the Division's <br />determination. <br />Specifically, information re <br />required cross-sectional dia <br />detailing the location(s) that <br />assumptions. <br />Upon receipt of information that 1 <br />its preliminary review of the subn <br />review will serve to determine ~ <br />reclamation plan. As stated in F <br />changes in the Reclamation Plan <br />Permit Amendment. <br />In the interim, the Division will <br />us on June 12, 2006. Additional <br />includes: proposed stream bank protection specifications, <br />of the proposed stream bank protection components, map <br />t bank protection will occur, and hydrologic and engineering <br />litively addresses these concerns the Division will complete <br />ion within 5 working days of receipt per Rule 1.8.1(6). This <br />degree of significance the proposed changes pose to the <br />1.8.1(5), the Division will decide whether the proposed <br />simply a clarification or require a Technical Revision or <br />its second adequacy review of the response submitted to <br />review concerns from this review aze forthcoming. <br />Office of Office of Colorado <br />Mined Land Reclamation Active and Inactive Mines Geological Survey <br />