Laserfiche WebLink
CIRCES Cost Estimatina Software <br />PROJECT IDENTIFICATION <br />Task # : 06b <br />Date : 10/05/2004 <br />User: SSS <br />State :Colorado <br />County :Mesa <br />Site : Whitewater Pit <br />PermiUjob# : M-1977-129 <br />Abbreviation :none <br />Filename : M129-O66 <br />Agency or organization name :DMG <br />Permit or other job action :TROT <br />Task description :Reps <br />HOURLY EQUIPMENT COST <br />recalculation of current reclamation liability <br />topsoil over TR-01 area of Phase 4-B <br />Basic machine :Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cah <br />Attachment no. 2 :3-shank ripper <br />Horsepower: 405 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $51.07 NA <br /> Operating cost/hour : $97.71 100 <br /> Ripper op. wsUhour : $0.00 0 <br /> Operator cost/hour : $31.83 NA <br /> Total unit cosUhour : $180.61 Total fleet costlhour : $180.61 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 32,267 LCY factor : NA volume : 32,267 LCY <br /> <br />Source of estimated volume :20 acres at 1 fUacre depth <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 250 feet Material consistency : 1.20 (Cat HB) <br />Unadjusted hourly production : 546.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshifUday) <br />Loose stockpile Spoil pile : 0.70 (fnd-mfJ <br /> Push gradient : 1.05 (Cat HB) <br />Average push gradient : 2.00 % (neg) Altitutle : 1.00 (Cat HB) <br />Average site altitude : 4,650 feet Material weight : 1.44 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 1,600 Ibs/LCY Net correction : 0.79 <br />Weight description <br />