Laserfiche WebLink
flov 30 03 04:32p Sunnyside Gold <br />970 387 531^ p.2 <br />SUNWYSIaE GDLa CGRPDAATIQN <br />AN ECHO 8AY COAQFASPY <br />P.O. Box 177 • Sllverton, CO 81433 <br />Phone (970) 3$7-5533 Fax (970) 387-5310 <br />December 1, 2003 <br />Mr. Wally Erickson, Reclamation Specialist <br />Division ofMinerals and Geology <br />Department ofNatural Resources <br />701 Camino del Rio, Room 125 <br />Durango, CO 81301 <br />RE: File No. M-77-378 <br />Post Mining Land Use Modification <br />Amendment No.S Technical Revision <br />Deaz Mr. Erickson: <br />Sunnyside Gold Corporation (SGC) submits the following Technical Revision to the <br />permit Amendment application (AM-OS) to modify the post-mining land use (PMLU) for <br />land and facilities (see enclosed map for modified affected area) within the American <br />Tunnel MLR permit boundary. <br />The AM-OS application is revised to remove any request for PMLU change or <br />reclamation plan change for lands within the Herbert Placer from consideration with <br />AM-O5. The PMLU and reclamation plan for the settling ponds within the Herbert Placer <br />(2.73 acres) will remain unchanged. The PMLU and reclamation plan changes requested <br />in the AM-OS application will only apply to the 7.71 acres not within the Herbert Placer. <br />~'. f ~„r~ n*S~~ <br />~.~ ~.~ ~-wl p'3 <br />~1..%i.. i~ 4 ~' <br />Included is a $150 check for the Technical Revision fee and a signed document receipt to <br />show that the Technical Revision was provided to the San Juan County Clerk to be <br />placed for Public Review. <br />S~ipncerely, <br />d~~ R~;_ <br />Larry Perino <br />Reclamation Manager <br /> <br />~y~rc;, <br />#~~~. ,~, <br />~,~n f ~~®~~ bpCio ItagY <br />