My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-02-27_REVISION - M1998013 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1998013
>
2003-02-27_REVISION - M1998013 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:49:39 PM
Creation date
11/21/2007 4:34:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998013
IBM Index Class Name
Revision
Doc Date
2/27/2003
Doc Name
Response to DMG letter dated 02/12/03
From
Tetra Tech
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Shores Resource -Amendment No. 1 <br />Table for Reclamation Cost Estimate <br />Activity Quantity Units Unit Costs Cost <br />A. Phase 8 - 95% mined -approximately 60 acres of <br />disturbance. Fill sideslopes of pond with overburden <br />material and shape, seed and mulch shoreline - <br />approximately 72851E perimeter distance at limit of <br />mining - 70351E at reclamation <br />1 Replace fill material using overburden and shape pond <br />side slopes at 3:1 236,249 CY $ 0.75 $ 177,187.00 <br />2 Replace overburden and shape the shoreline @ 4:1 13,028 CY $ 0.75 $ 9,771.00 <br />3 Replace 12" of topsoil on the shoreline @ 4:1 5,373 CY $ 0.75 $ 4,029.00 <br />4 Seed and mulch shoreline 3.33 Acres $ 800.00 $ 2,664.00 <br />.- ~; _R._> ,_ Subto"tal $;`f93.,65i~.00 <br />B. Dewatering trench would be excavated to nearly the <br />pond bottom elevation and fill with water ----- ----- ----- ----- <br /> <br />-~ '~ ~. ., s` <br />`: ~ ~:~. ,~~- <br />._ <,.. - _ _ ._ __~_...._ .. <br />-~r-- <br />.~, ~-: <br />. ~ 'rSulittital <br /> <br />.__ . __. ':='`~`~t; <br /> <br />_a.5. . <br />C. Phase 7 -Would be 100% reclaimed _____ _____ _____ _____ <br />v, - ~=~_ ~ ; r _ ~ .. , 'a: i .. ~ <br />s ~ <'=, = :;_ ~ A , SSttifotal ' =mix <br />D. Processing area. Processing equipment is portable and <br />would be removed by the operator <br />1 Move serge piles into settling pond 1,000 CY $ 0.75 $ 750.00 <br />2 Remove concrete pad for wash plant 15 CY $ 65.00 $ 975.00 <br />3 Remove concrete pad for asphalt plant 60 CY $ 65.00 $ 3,900.00 <br />4 Remove concrete pad for concrete plant 37 CY $ 65.00 $ 2,405.00 <br />5 Demolish and remove shop 1 LS $ 2,000.00 $ 2,000.00 <br />6 Remove concrete footings for office 8 CY $ 65.00 $ 520.00 <br />7 Remove concrete base for scale ] 0 CY $ 65.00 $ 650.00 <br />8 Scarify ground 25 Acres $ 150.00 $ 3,750.00 <br />9 Spread 12" topsoil 8,067 CY $ 0.75 $ 6,050.00 <br />] 0 Seed and Mulch 25 Acres $ 800.00 $ 20,000.00 <br />~ w z r , <br />~. ~t~,-~' ._ : ;:Subtotal $ ~':4'I;OOp:0.0: <br />E. Settling Ponds <br />1 Place 12" overburden on 0.25 acre 403 CY $ 0.75 $ 303.00 <br />2 Place 12" topsoil on 0.25 acre 403 CY $ 0.75 $ 303.00 <br />3 Seed and Mulch 0.25 Acres $ 800.00 $ 200.00 <br />.., _. <br /> <br />-_ s <br />?Subtotal $ :' `~ 806:00 <br />='>' ' ~° -' '. ' " : <br />~ <br />. <br />, ~ __ _ <br />F Slurry Wall @ 100% Installation Cost per DMG <br />Bonding Requirment. Assuming a total of 19,914 If of <br />wall, avg depth of 26.5' + 3' into bedrock <br />1 Excavation, Materials and Labor and Dewatering 587,463 Face Ft $ 3.00 $1,762,389.00 <br />` ° = Subiotal':~ $1>762,389.00 <br />Total Disturbance Costs $ 1,997,846 <br />Contractor Mobilization (S% of direct costs) $ 159,828 <br />Overhead (18.5% of direct costs) $ 369,602 <br />Administration 5% of contract amount) $ 126,364 <br />Total $ 2,653,639 <br />* Assumes 199]4 linear fee[, average depth 26.5' (+ 3' into bedrock) @ 100% <br />Revised 2.26.03 Per Mining Plan Revisions <br />HALL-IRWIN CORPORATION -THE SHORES AMENDMENT 1 (#M-1998-013) Page 22 of 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.