Laserfiche WebLink
.,, ..::. .,,.... __ Sheet20t2 <br />~......... ~ v~r~rmuCWT .. _. <br />Haul time (hours) _ <br />Retum time (hours) _. <br />Loading time (hours) _ <br />Unloading time (hours) _ <br />Subtotals = <br />JOB TIME AND COST <br />0.65 0.65 Total non-roadable mob/demob cost' : $1,449.86 <br />0.65 0.65 ' hvo round tdps with haul dg <br />0.50 NA Total roadable mob/demob cost": $0.00 <br />0.50 NA •• one round trip, no haul dg <br />2.30 1.30 <br /> Total job time : 4.80 hours <br /> Total iob cost : S1,450 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region : Cannon City <br />Transportation Cvcle Time : Non- Total one-way travel distance : 13.0 miles <br />Roadable Roadable Average travel speed : 20.0 mph <br />