Laserfiche WebLink
CIRCES Cost Estimating Software <br />Cf:RAPFR . ANI Y WORK <br />PROJECT IDENTIFICATION <br />Agency or organiza8on name : DMG <br />Task # : 003 State :Colorado <br />Date: 03222006 County :Fmmont <br />User : CMR Site :Oak Creek Grarel P8 <br />Permit or other job action :Succession o/ Oper <br />Task descdp8on : Spread 1.0 feet <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Cost Breakdown : Job u81iza8on °~ Horsepower : 590 <br />Ownership cosUhour : $46.97 NA Weight (UST) : 40.90 <br />OperaBng costlhour : $128.66 100 Cost data source : (CRG) <br />Operator cesUhour : $24.95 NA <br />Total unit cosUhour : $198.58 Total fleet cosOhour : $198.58 <br />Initial <br />volume: 32,267 LCY <br />Saaper Bowl (volume) Basis <br />Source of quantity take-off :Reclamation Plan <br />Source of estlmated swell factor :NA <br />HOURLY PRODUCTION <br />Haulino Capacity <br />Basis <br />Material weight: 1,600 pounds/LCY <br />Material description <br />Too Soil <br />Rated payload : 48,000 pounds <br />Payload capacity: 30.00 LCY <br />Gvcle Time (load + haul + spread + retuml <br />Tr~vnl limn <br />OVB/ 20 aC/a3 <br />SWCk volume: 14.00 L(:Y <br />Heaped volume : 20.00 LCY <br />Average volume : 17.00 LCY <br />Adjusted cepadty : 17.00 LCY "' <br />Loading tlme : 1.50 minutes <br />Maneuver and spmading tlme : 0.60 minutes <br />loading ama Oer Delr an push-pull models <br />Route Distance (feet) Grade (%) Roll. res.(%) Total res.(%) Velocity (fpm) Travel 8me (min.) <br />Haul: 450 5.0 4.0 9.0 1,249 0.42 minutes" <br />Retum : 450 -5.0 4.0 -1.0 2,938 0.21 minutes " <br />gavel time adjusted for acceleration and decelmtion at load and dump prints <br />velOtiaes are mat. attainable per total reslsUnce mown, not average <br />Job Conditlon Comectlon Factors <br />Site altitude (feet) : 7,800 <br />AlBtude adjustment factor : 0.96 (Cat HB) <br />Job efficiency factor : 0.83 (1 shi8/day) <br />Net job cerreceon factor : 0.80 <br />Total cyGe time : 2.73 minutes <br /> <br />Adiusled Houdv Praduc8on <br />Unadjusted unit production : 373.78 LCY/Hour"' <br />Adjusted unit produc8on : 29781 LCYlHour <br />Adjusted fleet production : 297.81 LCYlHour <br />2 rimes vdume an push.pull modda <br />JOB TIME AND COST <br />Fleet size : 1 Scraper(s) Total job 8me : 108.35 Hours <br />Unit cost : $0.667 /LCY Total job cost : ;21,515 <br />Model:Cat627G <br />Swell Loose <br />factor: NA volume: 32,287 LCY <br />Peonitlob # : Ati J989-084 <br />Abbrevia8on :none <br />Filename :M084-003 <br />