Laserfiche WebLink
CIRCES Cost Estimating SoHware <br />PROJECT IDENTIFICATION <br />Task # : 001 <br />Date : 03f20/2006 <br />User : CMR <br />State :Colorado <br />County :Fremont <br />Site :Oak Creek Gravel <br />PermiUjob # :14N1989-084 <br />Abbreviation :none <br />Filename : M-1989-084-001 <br />Utilization <br />Cost Breakdown : Ownership cosUhour : $54.16 NA <br />Dozer operating cosUhaur: $75.57 100 <br />Ripper operating cost/hour : $7.98 100 <br />Operator cosUhour : $32.53 NA <br />Total unit cosUhour : $170.24 Total fleet cosUhour : 5170.24 <br />MATERIAL QUANTITIES <br />Selected estimating method : Area <br />Alternate methods - <br />Seismlc : NA NA Load factor : NA Bank volume : NA BCY <br />Area : 15.00 acres Rip depth (ft) : 1.00 Volume : 24,200 BCV or CCY <br />Source of estimated quantity :Revised Reclamation Plan <br />Source of estimated load factor :NA <br />HOURLY PRODUCTION <br />Altematemethods- <br />Seismic : Seismic velocity : <br />NA <br />feef/second .,_..-.._..____ _ <br />Unadjusted production <br />d <br />h <br /> <br />18 <br />1 <br />326 <br /> <br />yds./hour <br />cu <br /> NA /hour <br />yds <br />cu o <br />: <br />per selected met , <br />. . <br />Unadjusted production : . <br />. <br /> <br />00 <br />1 <br />feeUpass Site altitude : 7,800 feet <br />Area : Av ri ing depth : <br />g pp . t 00 <br />1 (Cat HB) <br /> ass <br />f/ <br />f : <br />Altitude adjustmen . <br />Average ripping width : 7.08 ee <br />p t <br />f 83 <br />0 (1 shifl/day) <br /> 0 <br />00 ass <br />feeU or : <br />ac <br />Job efficiency . <br />Average ripping length : . <br />50 p i 83 <br />0 multiplier <br /> 00 <br />8 feet/minute on : <br />Net job correct . <br />Average dozer speed : . <br />8 <br />Average maneuver time : 0.25 minutes/pass <br />/hour <br />ds <br />i 822 <br />0 acres/hour Adjusted unit production : 1,100.73 . <br />cu. y <br />t area : <br />Production per un <br />Unadjusted production : . <br />1,326.18 cu. yds.lhour Adjusted fleet production : 1,100.73 cu. yds /hour <br />JOB TIME AND COST <br />i <br />1 <br />dozers) <br />Total job time : <br />21.99 <br />hours <br />ze : <br />Fleet s <br />Unit cost : $0.155 per cu. yd. Total lob cost : 53,743 <br />;< <br />