My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-03-07_REVISION - M1977141
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977141
>
2003-03-07_REVISION - M1977141
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:49:39 PM
Creation date
11/21/2007 4:32:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977141
IBM Index Class Name
Revision
Doc Date
3/7/2003
Doc Name
Legal Right of Entry
From
DMG
To
Aggregate Industries - WCR Inc
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r--, <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3561 <br />FAX: (303) 832-8106 <br />Mazch 7, 2003 <br />Mr. Damian Murphy <br />Aggregate Industries- WCR, Inc. <br />3605 S. Teller St. <br />Lakewood, CO 80235 <br />RE: Aggregate Industries-WCR, Inc.; Permit No. M-1977-141 ~f}(Yl-~1) <br />Lyons Quarry Amendment Application- Legal Right of Entry <br />Dear Mr. Murphy, <br />DIVISION OF <br />MINERALS <br />GEOLOGY <br />RECLAMATION <br />MINING•SAFETY <br />Bill Owens <br />Governor <br />Greg E. Walther <br />Executive Director <br />Ronald W. Cattany <br />Division Director <br />During the adequacy review for the Lyons Quarry Amendment Application (Permit No:.M-1977-141}, the <br />Division requested that Aggregate Industries submit documentation demonstrating legal right of entry on a <br />portion of the access road outside of the lease boundary on the eastside of Section 26. The operator hasbeen. <br />unable to obtain this documentation, and has in fact extended the decision date with the Division on Five- :. <br />separate occasions. <br />Please be reminded that Kule 1.4.1(9) of the Construction Materials and Regulations allows the review. time <br />to be extended and the decision date reset, not to exceed 365 days from the date the. application wasfiled. In <br />the case of the Lyons Quarry Amendment Application, the Division must make a decision on or before June ... <br />12, 2003. Without proper legal right of entry, the application may be denied. As an altertrative; the road <br />could be removed from the amendment permit area and reclaimed to the standards noted in the permit.. <br />The Division will grant the latest request by the operator for an extension to the decision date to April 10, <br />2003. The 365-day period is quickly approaching, and the Division hopes that Aggregate Industries and the <br />landowner can reach an agreement for the inclusion of this portion of the road. Failure to either permit or . <br />reclaim this road feature may involve future actions taken by the Division. <br />If you have any questions, please do not hesitate to call. <br />Sin trely, <br />nca Crosby ~~~J <br />Environmental Protection'Specialist <br />cc: Carl Mount; DMG (via electronic transmission) <br />Greg Knell; SRK Consulting <br />
The URL can be used to link to this page
Your browser does not support the video tag.