My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-12-05_REVISION - M2001035
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2001035
>
2006-12-05_REVISION - M2001035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:49:39 PM
Creation date
11/21/2007 4:31:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001035
IBM Index Class Name
Revision
Doc Date
12/5/2006
Doc Name
Inadequate Ltr
From
DRMS
To
ACA Products, Inc.
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Over a period of 5 to 15 years the flood outwash material would be mined down to the original <br />topsoil layer that existed prior to 1900. This topsoil layer is a silt layer that has been located in <br />other portions of the general permit <br />azea The depth to this topsoil <br />layer is estimated at 6 t6 15 feet in <br />depth. The flood outwash <br />materials aze generally very sandy <br />and contain a wide variety of <br />material sizes but generally they <br />are smaller than boulder sized. <br />The gravel pit would follow the <br />curve of the granite outcrops that <br />exist on the east side of the site, <br />The end result would be a <br />detention basin that would contain <br />the excess water fiom the reservoir <br />during the winter months and this <br />water would percolate into the <br />ground water in that azea. As the <br />spring irrigation season begins, this <br />detention basin would gradually <br />dry up. Vegetation would need to <br />be established in a manner that <br />would comgliment this situation. <br />ACA Products is working with the <br />local Natural Resource <br />Conservation Service staff <br />regarding a vegetation plan and are <br />agreeable to a plan that would help <br />provide seasonal <br />waterfowl/wildlife habitat. A vegetation proposal has not been identified to date. <br />pond design would include shallow slopes (3:1 or less). <br />The overall <br />According to the letter from the office of the state water engineer "Should conditions at the site <br />change whereby there was exposure of ground water, saturation of the sand and gravel in the <br />mining azea due to a flow of water past the dam on Trout Creek Reservoir, or due to desire by <br />the operator of the gravel mining operation to being washing of material onsite or use of water <br />from the site for dust control it would be necessary to obtain a Substitute Water supply Plan <br />approved pursuant to the above statute prior to continuing any further mining operations." <br />The following are a series of photographs fiom the site location. <br />
The URL can be used to link to this page
Your browser does not support the video tag.