My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-06-07_REVISION - M1997014
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997014
>
2004-06-07_REVISION - M1997014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:43 AM
Creation date
11/21/2007 4:29:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997014
IBM Index Class Name
Revision
Doc Date
6/7/2004
Doc Name
FW Increase
From
DMG
To
Aggregate Industries - WCR Inc
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION <br />Hauling Capacity <br />Basis <br />Material weight: 1,600 pounds/LCY <br />Material description <br />Top Soil <br />Rated payload : 48,000 pounds <br />Payload capacity : 30.00 LCY <br />Bowl (volume) Basis <br />sheet 2 of 2 <br />Struck volume : 14.00 LCY <br />Heaped volume : 20.00 LCY <br />Average volume : 17.00 LCY <br />Adjusted capacity : 17.00 LCY "' <br />howdy pmtluctlon reflects volume per scaper pair on push~ull models <br />Cvcle Time : ob Condition Corrections : -Site altitude (tt.) : 6,500 <br /> Scraper Push dozer Source <br />Scraper loading time • : 0.50 minutes Altitude adj.: 1.000 1.000 (Cat HB) <br />Maneuver and spread time : 0.70 minutes Job efficiency : 0.830 0.830 (Cat HB) <br />• load Cme per scraper pair on push-pull models Net CArteCtlOn ' 0.830 0.830 <br />Travel time <br />Road condition description :Rutted dirt little maintenance, no water, 2" Sre penetra0on <br />Haul Route <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)"' <br />1 1,200 5.00 5.00 10.00 740 1.64 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Haul time : 1.64 minutes <br />Retum route <br />''travel timefor each segment is adjusted for acceleretion/decele2tion. ~ Retum time: 0.54 minutes <br />table vebcities are max attainable par total ~resistznce shown, not average - - - - ~ - ~ ~ - - - - - ~ - - - ~ - . <br />Total scraper team cycle time (load + haul + maneuver and spread + return) <br />Unadjusted unk production/hour : 301.81 LCY/hour'•" Adjusted for job conditions <br />Optimal number of scrapers per push dozer : 3 Selected number of scrapers <br />Adjusted single scraper team (unit) hourly production <br />Adjusted multiple scraper team (fleet) howdy production <br />JOB TIME AND COST <br />3.38 minutes <br />250.51 LCY/hour <br />3 scraper(s) <br />751.52 LCY/hour <br />751.52 LCY/hour <br /> Fleet size : 1 Team(s) Total job time : 18.59 Hours <br /> Unit cost : 50.788 /LCY Total job cost : $11,012 <br />~•::~ <br />.n ~ :. ~ <br />~ <br />::. r <br />s <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.