My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-04-23_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2003-04-23_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:52 PM
Creation date
11/21/2007 4:29:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
4/23/2003
Doc Name
Weekly Construction Report
From
CC&V
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br />c =Golder <br />ASSOC1dteS <br />Golder Associates Inc. APR 2 3 ZO(13 <br />44 Union Boulevazd. Suite 300 <br />Lakewood, CO 80228 Division of Minerals and Geology <br />(303)980-0450 <br />(303) 985-2080 <br />April 15, 2003 <br />Golder Project No.: 003-2203 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, CO 80860 <br />RE: Summary No. 12: March 9 through Apri112, 2003 <br />Cresson Project Phase IVb, c Construction Quality Assurance <br />Deaz Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase PJb and c Construction <br />Quality Assurance (CQA) services performed for the Cresson Project during the period of March 9 <br />through April 12, 2003. <br />The weather during this reporting period was cleaz to cloudy. Approximate daytime low <br />Temperatures ranged from 7° F to 36° F, and highs ranged from 24° F to 63° F. Weather <br />observations were made on five days of this thirty-five-day reporting period. <br />Construction Synopsis <br />Ames Construction Inc. (Ames) of Aurora, Colorado is the earthworks contractor for the Phase IV b <br />and c construction. Ames conducted Phase N b and c construction activities on four days of this <br />reporting period (Apri17, 9, 10, and 11). <br />Ames mobilized personnel and equipment off site for approximately 4 weeks during this reporting <br />period. <br />Phase FV b <br />Ames pumped water stored in the Phase IV PSSA Low Volume Solution Collection (LVSC) sump <br />to the Phase II pad periodically throughout the week of Apri17 through 11, 2003. <br />Ames used a Caterpillar D7 dozer to track down snow drifts on the Low Volume Solution Collection <br />Fill (LVSCF) to accelerate melting of the snow, and assist in prepazation of the Phase IVb PSSA <br />geomembrane deployment areas. <br />
The URL can be used to link to this page
Your browser does not support the video tag.