My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-11-05_REVISION - m1983176 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
2002-11-05_REVISION - m1983176 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:35:54 PM
Creation date
11/21/2007 4:28:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
m1983176
IBM Index Class Name
Revision
Doc Date
11/5/2002
Doc Name
Mine Plan Map
From
Asphalt Specialities
To
DMG
Type & Sequence
AM2
Media Type
M
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDINARY HIGH <br />WATER MARK <br />(USACOE) <br />LOW WATER <br />CHANNEL BANK <br />SOUTH <br />PLATTE <br />RIVER <br />001OR" <br />TOP OF BANK <br />(UD &FCD) <br />MINING LIMITS <br />APPROX. GROUND <br />WATER LEVEL <br />100' I I- t18 " -24" <br />100' <br />TOP OF BANK <br />UD &FCD HIGH <br />MINING LIMITS WATER BANK <br />(VARIES WITH PERIMETER <br />OF TREE ROOTS) <br />NATURAL <br />STONE <br />RIPRAP <br />COMPLETE MINING / RECLAMATION <br />CROSS SECTION (A -A1) <br />SCALE: 1"= 50' <br />SEEDED <br />TOPSOIL <br />PROCESSED CONCRETE <br />RIPRAP <br />WATER LEVEL 3' <br />' - - - ,- 111 III �I II II��!l ���l ���O�O�!\ O!! O�i�����l S! �O�! ��K! O! !O��i�!�\oGO!!o!O�i��i�! , <br />MINING LIMITS <br />(VARIES WITH PERIMETER <br />OF TREE ROOTS) <br />PROCESSED CONCRETE <br />RIPRAP (2' THICK) <br />LOW WATER <br />CHANNEL NATURAL STONE <br />1 THICK <br />BANK LEVEL � RIPRAP ( ' ) <br />r 5' <br />r" ` BACKFILL <br />DETAIL 2: RIVERSIDE PROTECTION (C -C1) <br />SCALE: 1"= 30' <br />ORDINARY <br />HIGH WATER <br />MARK (USACOE) <br />A <br />/ <br />UD &FCD HIGH <br />WATER BANK <br />/ g1� <br />ORDINARY / <br />HIGH WATER <br />MARK (U8ACOE) <br />om <br />100' <br />/ AREAS 2 <br />APPROX. 6.2 ACRES <br />1 /(PHASE 1 MINING, YEARS 1 -2) <br />1 <br />/ HEADCUTTING <br />1 PROTECTION AREA °F <br />/ (SEE DETAIL) <br />I 1 / <br />1\ 00' / <br />1 <br />UD &FCD <br />HIGH WATER <br />BANK <br />\ 100' �\ <br />\ 1 SETTL NG <br />PONDS <br />\ ARE <br />LAND WEST THIS LINE <br />IS SUBJECT TO C NSERVATION <br />EASEMENT APPRO 15 ACRES I <br />c � C <br />7 <br />100' <br />L-3— 50' <br />PROCESSED CONCRETE <br />RIPRAP <br />I <br />A 50' ' <br />—� <br />'OF <br />A' <br />INITIAL AGGREGATE <br />PLANT SITE <br />J <br />PILES <br />PILES CP <br />PIT -SIDE <br />PROTECTION <br />LIMIT <br />PROCESSED <br />CONCRETE <br />RIPRAP <br />WATER LEVEL <br />BACKFILL AREA <br />50 0 50 100 <br />SCALE IN FEET <br />1'= 100' <br />F <br />OC <br />II UD &FCD���p� <br />1 HIGH WATER <br />O��P <br />/RjEiP�G °� \ <br />\ �S <br />I 50' <br />1 � <br />/ �50' MINING LIMITS 25' <br />/ z O <br />I oz <br />Lu _z / <br />/ 1 00 <br />PIT -SIDE / <br />/ PROTECTION <br />/ LIMIT � <br />I <br />LAND WEST OF THIS <br />LINE IS SUBJ CT TO 1 <br />CONSERVATION EASEMENT j <br />ll <br />/ / I AMENDMENT AREA (AREA 3) 1 <br />APPROX. 11.4 ACRES I <br />/ / 1 (PHASE 2 MINING, YEARS 3 -4) <br />/ 1 <br />1 <br />UD &FCD <br />i WATER I <br />BANK / 1 <br />zZ <br />1 oz I <br />LL <br />�Z <br />U <br />/ 1 <br />of <br />� O <br />/ 1 <br />/ / I <br />I MINING LIMITS 25' <br />1 / <br />/ 1 I <br />zo <br />Ld / <br />z <br />rrrr / <br />W �N• <br />50 I ' <br />AREA 1 <br />APPROX. 29.6 ACRE <br />(PHASE 1,3 MINING, YEARS 1 -2 & 5 -6) <br />RECYCLE SITE <br />AND FINAL AGGREGATE <br />PLANT SITE <br />PRO <br />D D <br />:PILES PILES <br />:PILES <br />EQUIPMENT <br />PARKING <br />i <br />"J <br />OFFICE <br />'emu <br />/ AREA 4 <br />\ APPROX. 4.3 ACRES <br />( HASE 3 MINING, YEARS 5-6) O <br />\ o <br />f \ \ <br />SCALE <br />J <br />a <br />MINING LIMITS 25 <br />O <br />LEGEND <br />PERMIT BOUNDARY <br />— - - - <br />- — AMENDMENT BOUNDARY <br />MINING LIMITS <br />ENTRANCE /EXIT ROADS <br />— — <br />i <br />RIVER /STREAM /WATERWAY <br />ORDINARY <br />HIGH WATER <br />MARK (USACOE) <br />A <br />/ <br />UD &FCD HIGH <br />WATER BANK <br />/ g1� <br />ORDINARY / <br />HIGH WATER <br />MARK (U8ACOE) <br />om <br />100' <br />/ AREAS 2 <br />APPROX. 6.2 ACRES <br />1 /(PHASE 1 MINING, YEARS 1 -2) <br />1 <br />/ HEADCUTTING <br />1 PROTECTION AREA °F <br />/ (SEE DETAIL) <br />I 1 / <br />1\ 00' / <br />1 <br />UD &FCD <br />HIGH WATER <br />BANK <br />\ 100' �\ <br />\ 1 SETTL NG <br />PONDS <br />\ ARE <br />LAND WEST THIS LINE <br />IS SUBJECT TO C NSERVATION <br />EASEMENT APPRO 15 ACRES I <br />c � C <br />7 <br />100' <br />L-3— 50' <br />PROCESSED CONCRETE <br />RIPRAP <br />I <br />A 50' ' <br />—� <br />'OF <br />A' <br />INITIAL AGGREGATE <br />PLANT SITE <br />J <br />PILES <br />PILES CP <br />PIT -SIDE <br />PROTECTION <br />LIMIT <br />PROCESSED <br />CONCRETE <br />RIPRAP <br />WATER LEVEL <br />BACKFILL AREA <br />50 0 50 100 <br />SCALE IN FEET <br />1'= 100' <br />F <br />OC <br />II UD &FCD���p� <br />1 HIGH WATER <br />O��P <br />/RjEiP�G °� \ <br />\ �S <br />I 50' <br />1 � <br />/ �50' MINING LIMITS 25' <br />/ z O <br />I oz <br />Lu _z / <br />/ 1 00 <br />PIT -SIDE / <br />/ PROTECTION <br />/ LIMIT � <br />I <br />LAND WEST OF THIS <br />LINE IS SUBJ CT TO 1 <br />CONSERVATION EASEMENT j <br />ll <br />/ / I AMENDMENT AREA (AREA 3) 1 <br />APPROX. 11.4 ACRES I <br />/ / 1 (PHASE 2 MINING, YEARS 3 -4) <br />/ 1 <br />1 <br />UD &FCD <br />i WATER I <br />BANK / 1 <br />zZ <br />1 oz I <br />LL <br />�Z <br />U <br />/ 1 <br />of <br />� O <br />/ 1 <br />/ / I <br />I MINING LIMITS 25' <br />1 / <br />/ 1 I <br />zo <br />Ld / <br />z <br />rrrr / <br />W �N• <br />50 I ' <br />AREA 1 <br />APPROX. 29.6 ACRE <br />(PHASE 1,3 MINING, YEARS 1 -2 & 5 -6) <br />RECYCLE SITE <br />AND FINAL AGGREGATE <br />PLANT SITE <br />PRO <br />D D <br />:PILES PILES <br />:PILES <br />EQUIPMENT <br />PARKING <br />i <br />"J <br />OFFICE <br />'emu <br />/ AREA 4 <br />\ APPROX. 4.3 ACRES <br />( HASE 3 MINING, YEARS 5-6) O <br />\ o <br />f \ \ <br />SCALE <br />J <br />a <br />MINING LIMITS 25 <br />O <br />Permit # 0S i - / __7 ( Confidental ?: ICI <br />Class: I s 1 moil Type- Seq.:, tit C <br />From: „Tic.4 S,r (dhrTTo: D .I /� <br />Doc. Na e: <br />Doc. Date (if no date stamp): / r <br />Specialist: <br />RECEIVED <br />NOV n 5 "^n2 <br />EXHIBITC-2 Division of Minerals and Geology <br />MINE PLAN MAP <br />M -83 -176 AMENDMENT 2 <br />LEGEND <br />PERMIT BOUNDARY <br />— - - - <br />- — AMENDMENT BOUNDARY <br />MINING LIMITS <br />ENTRANCE /EXIT ROADS <br />— — <br />UD &FCD HIGH WATER BANK <br />RIVER /STREAM /WATERWAY <br />PIT -SIDE PROTECTION LIMIT <br />EXISTING STRUCTURES <br />TYPICAL TOPSOIL <br />STOCKPILE <br />Permit # 0S i - / __7 ( Confidental ?: ICI <br />Class: I s 1 moil Type- Seq.:, tit C <br />From: „Tic.4 S,r (dhrTTo: D .I /� <br />Doc. Na e: <br />Doc. Date (if no date stamp): / r <br />Specialist: <br />RECEIVED <br />NOV n 5 "^n2 <br />EXHIBITC-2 Division of Minerals and Geology <br />MINE PLAN MAP <br />M -83 -176 AMENDMENT 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.