Laserfiche WebLink
. � p <br />1 <br />b <br />,Y <br />1 � <br />r r�� <br />- Y <br />".K <br />°• alw�N <br />t <br />tiw',rt4: <br />v <br />.. <br />0 160 300 600 <br />HIGHWAY <br />NOTE: NUMBERING OF EXTRACTION AREAS CHANGED TO) <br />REFLECT ALTERATION IN SEQUENTIAL SCHEDULE:. <br />LEGAL DESCRIPTI3N <br />The proposed extraction area lies in Sections 15, 16, and 17 of T5N, R69W of the 6th P.M. <br />Permit #: [ ] -/49'f -0(0 9 Confidental ?: k) <br />Class: %�L'V(SfyV, Type- Seq.: -/ <br />From: we%,d & To: b In <br />Doc. Name: ExH F Rpe / ,,, c o>, rrlcyo <br />Doc. Date (if no date stamp):��7 p <br />I <br />I � <br />.r . F - <br />...kr <br />Y Pro V A ! a <br />�I I`r <br />44q I <br />e 1 t <br />RECLAMATION PLAN <br />1. The intent of reclamation is to leave a series of lakes interconnected by land masses to be used for camping, hiking <br />and fishing. <br />2. The banks of the lakes are to be sloped at a ratio of 3:1 from finished grade to 10 feet below the expected water <br />level with no slopes steeper than a ratio of 2:1. (See detail this sheet) <br />3. The lakes will be stocked with fish,and the area landscaped with shrubs, grass and existing trees. <br />4. The topsoil will be replaced at a minimum depth of 6 inches and then seeded with a mixture of grasses as recommended <br />by the Soil Conservation Service. <br />5. The total cost of reclamation is estimated to be $13,650 plus augmentation of an estimated 0.51 c.f.s. of water to <br />offset evaporation losses. The applicants interest in Priority No. 9 of the Rist and Goss Ditch is 4.27 c.f.s. of <br />which a portion will be used for this purpose. I <br />-- i <br />N <br />as <br />(p N <br />, -I <br />(V N <br />PROPOSED LAKF(TYP1 <br />F9f <br />l <br />—1;Z- EXISTING GROUND <br />APPROX. ELEV. =4985 (U.S.G.S.) <br />L_— + APPROX. WATER LEVEL <br />3 O <br />PROPOSED FINISHED <br />TYPICAL PIT BANK CROSS SECTION <br />NO SCALE <br />LIMITS OF <br />EXCAVATING <br />DATE JUNE <br />SCALE: AS SI, <br />DRAWN : L. L.h <br />CHECKED P• <br />APPROVED I <br />J <br />W <br />J <br />O <br />C <br />N <br />C <br />O <br />U <br />3 <br />N <br />N <br />CL <br />X <br />a) <br />CL <br />m <br />X <br />N <br />U <br />N <br />O <br />Q <br />N <br />L ^. <br />O <br />C <br />O <br />N <br />C <br />W <br />Q) <br />o` <br />0 <br />0 <br />a <br />iv <br />r <br />0 <br />a <br />c <br />m <br />o` <br />N <br />0 <br />CETED <br />N 0 1 2��,3 <br />c i Divis <br />Z <br />I Minerals 40LGe <br />ogt <br />w <br />I— <br />h- <br />EE <br />�W�/ <br />IX <br />X <br />W <br />Q <br />z <br />O <br />W a. <br />U <br />0 2 <br />X0 <br />M <br />a. <br />Q <br />O <br />(M <br />Q <br />t <br />W O <br />Q <br />U <br />J <br />p <br />U <br />W <br />Q Q <br />J J <br />W W <br />i <br />°g <br />I <br />t <br />Lrl <br />� <br />E-' <br />t <br />PROJECT <br />NO. <br />r <br />i <br />LOVRE91041 <br />D18330Al <br />J <br />W <br />J <br />O <br />C <br />N <br />C <br />O <br />U <br />3 <br />N <br />N <br />CL <br />X <br />a) <br />CL <br />m <br />X <br />N <br />U <br />N <br />O <br />Q <br />N <br />L ^. <br />O <br />C <br />O <br />N <br />C <br />W <br />Q) <br />o` <br />0 <br />0 <br />a <br />iv <br />r <br />0 <br />a <br />c <br />m <br />o` <br />N <br />0 <br />