Laserfiche WebLink
• • <br /> 100 <br /> 1 The next application will be the Snyder Quarry, <br /> 2 77-210 for our record, and we need more information on the -- <br /> 3 It should include access roads, roads to mine as affected landr <br /> 4 limit permit to area of surface disturbance. The reclamation <br /> 5 plan should state that Castle Concrete brings to some other <br /> 6 use besides parkland, amphitheater, and so forth. This appears <br /> 7 to be speculative. It should include thickness, source of soil <br /> 8 and slope of berm, the 50-foot berm that is being put around <br /> 9 the front of the operation for a cover. <br /> 10 How will phospherous and fertilizer be incorpora ed? <br /> : . 11 It must be drilled. <br /> 12 What happens to water that ends up in this <br /> 13 quarry? Have a bowl effect on this. <br /> 14 And $38,000 bond on the 27 acres prior to <br /> J <br /> 15 adjustment for haul and access roads which they should include. <br /> 16 MR. SULLIVAN: Okay. Then, Jim, would you go <br /> 17 on with the other presentation that you have? But, first, <br /> 18 you do recommend that this be continued? <br /> 19 MR. SCHMIEDING: Yes, sir. <br /> 20 11R, SULLIVAN: Okay. <br /> 21 MR. HEIFNER: You want the Pikeview next, right? <br /> 22 MR. SULLIVANt Yes, please. <br /> 23 MR. SCHMIEDING: The next one is Pikeview Quarry <br /> 24 For our records, this is 77-211, and the inadequacies were: <br /> 25 include access roads, old access roads, sediment pond areas, <br />