Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORit <br />Task # : 001 <br />Date : 02/22!2005 <br />User : GRS <br />State :Colorado PermiUjob# : M1986-048 <br />County :Morgan Abbreviation :none <br />Site :Nicholson Pit Filename :M048-0Ot <br />Agency or organization name : CO. DMG <br />Permit or other job action : SO Application <br />Task description :$pread tUpS01/ <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />Basic machine :Cat D8R Series II - 8SU Horsepower : 310 <br />61ade type ;Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 :NA <br /> Utilization <br />Ownership cosUhour : $44.24 NA <br />Operating cost/hour : $61.43 100 <br />Ripper op.cosUhour : $0.00 NA <br />Operator cosUhour : $24.01 NA <br />Total unit cost/hour : $129.68 Total fleet cosUhour <br />MATERIAL QUANTITIES <br />Initial <br />volume: 32,000 LCY <br />Source of estimated volume :Ap1 <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION <br />Swell Loose <br />factor : NA volume <br />Average push distance : 200 feet <br />Unadjusted hourly production : 491.9 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Earth -Dry packed <br />5.00 % (/ <br />4,000 feet <br />2,550 Ibs/LCY <br />JOB TIME AND COST <br />Fleet size <br />Unit cost <br />1 Dozers) <br />$0.650 /LCY <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1.00 <br />Visibility ; >.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 0.90 <br />Altitude : 1.00 <br />Material weight : 0.90 <br />Blade type : 1.00 <br />Net correction : 0.41 <br />$129.88 <br />Adjusted unit production : 199.57 LCY/hr <br />Adjusted fleet production : 199.57 LCY/hr <br />Total job time : 160.35 Hours <br />Total job cost : $20,794 <br />Data source : (CRG) <br />