Laserfiche WebLink
HHCLANATION COST 9UXNA8Y cant'd • sheet 4 of 4 • <br />g. PORTAL/SHAFT SBAL[NC <br />Taek No.; Taek Description ; Cost (51 <br />~, <br />, , <br />, , <br />, , <br />, , <br />, <br />, , <br />........:..................................................:............ <br />Subtotal (HI: <br />------------ <br />L. DRILL BOLE/NONITOBINO NBLL BRACING <br />Task No.; task Description ; Cost (SI <br />, , <br />, ; <br />, <br />, <br />, <br />...........................................................:............ <br />9uhtotal (LI: <br />d. NI9C8LLANSOU9 88CLANATION TA9H9 <br />fast No.; Taek Description Coet (!I <br />, ',' <br />, , <br />;Structural De~olition ; <br />Nlk2 ; 8evegetation ; 5481,475 <br />; Fencing ; <br />N3 8obilitatian/De~obiliaatioa 54,500 <br />9uhtotal (NI: 5491,9T5 <br />TOTAL DIHBCT flHCLA8ATI0N CO9T9 (subtotals A through NI: 51,464,625 <br />------------ <br />II. INDIBBCT C09T9 <br />------------------------------------------------------------------------ <br />A. CONTflACTOfl'9 OYBHBBAD A PROFIT <br />Ite~ No.; Ite~ Description Coat (SI <br />, , <br />1. ; Puhlic LiabilitT Insurance.... 1.5501 of dir. S2t,T02 <br />2. Contractor's Petforaasce Boad 0.97SS of dir. 514,290 <br />7. ; Contractor's Pro[it........... IO.OOS of dir. ; 5146,467 <br />4. ]ab 9uperiatendant (total frog uorksheetl 514,961 <br />........................................................................ <br />Subtotal (AI: 5198,705 <br />TOTAL CONSTRUCTION CONTRACT A80WT (direct plus 0 A PI: !1,662,970 <br />B. CMLBD CONTRACT ADMINISTRATION BfP8N969 <br />Ite~ No.; Itea Description ; Coet I!I <br />, <br />1. ; Contract Preparation Fees..... 4.251 of cntr.; 510,6TS <br />E. DMC Adaia. Brpeases <br />...........................................................:............ <br />98T [NDIHBCT C09T PHBCBNTAC6: 18.7TS Subtotal (BI: 510,fi15 <br />TOTAL INDIBBCT 88CLANATION C09T9 (subtotals A through BI: 326&,980 <br />TOTAL PBRFOflMANCB BOND ANOUNT (direct plus indirect costs!: f1,177,605 <br />