My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-12-23_REVISION - M1992045 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1992045
>
2005-12-23_REVISION - M1992045 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:49:38 PM
Creation date
11/21/2007 4:20:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992045
IBM Index Class Name
Revision
Doc Date
12/23/2005
Doc Name
Transmittal of Comments from OSE and Chaffee County
From
DMG
To
James VanElla
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~- <br />STATE OF COLORADO <br />AFFICE OF THE STATE ENGINEER <br />Division d Water Resources <br />Departtnertt d NaWral Rewurces <br />RECEIVED <br /> <br />13~~9r ~ 8010Roorn 878 /DEI. ~ ~ LYW <br />Plrorr (30318tifi-35a1 <br />FAX t30318fi43589 <br />~,~~.~~ ,AltdaNa of Minarah sad G.NOry <br />Response to Reclamation Permit Application Consideration <br />DATE: /December 21, 2005 <br />TO: 'Carl B. Mount, Senior Environmental Protection Specialist <br />CC: Division 2 Office; D1is-trlict t 1 Water Commissioner <br />FROM: Don West, P.E. O V" ..~~ <br />RE: Gold Basin Mine, File No. M-1992-045 AiNI <br />Operator: James VanElla <br />Contact: James VenElla 260/665-7060 <br />Section 5, Twp 125, Rng 80W, 6th P.M„Chaffee County <br />ail Oran <br />a,®ar ~ <br />FxnuFe 04ena <br />Hal D. SYnpson, P.E <br />Sole Eripneer <br />CONDITIONS FOR APPROVAL <br />^ The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. If stormwater is contained on-site, it must <br />infiltrate into the ground or be released to the natural stream system within 72 hours, or all work <br />must cease until a substitute water supply plan, or augmentation plan approved by water court, is <br />obtained. Reclamation plans must ensure water will not be retained onsite for more than 72 hours <br />unless an augmentation plan approved by water court is obtained. <br />® The proposed operation will consume water by: ®evaporation, ^ dual control, <br />^ reclamation, ®water removed in the mined product, ®processing, ^ other:. <br />Prior to initiation of these uses of water, the applicant will need to obtain an approved water supply <br />plan or decreed plan for augmentation. <br />^-- Pn'or to dpproving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must then <br />obtain a waiver of objection from all well owners with wells within 600 feet of the permit area or <br />request a hearing before the State Engineer. <br />^ Other: <br />COMMENTS: The applicant has not included a water supply report in the DMG application regarding <br />water use, water consumption, water rights, or replacement water. The Division of Water Resources <br />recommends no favorable action regarding the amendment application until the information is provided and <br />evaluated. The applicant may need to obtain the services of a water rights engineer to assist with the <br />preparation ofa water supply report. <br />
The URL can be used to link to this page
Your browser does not support the video tag.