Laserfiche WebLink
('OOLEY AND FULTON LAKES PIT <br />A'VIENDMENT NO. 1 - JERONIlVIUS PROPERTY <br />(Revised 05/03) <br />EXHIBIT H -WILDLIFE INFORMATION <br />Note: The letter from DOW is copied as the submittal for this exhibit. <br />Since the original Amendment No. 1 application was submitted, an additional letter from DOW with <br />more complete information on existing wildlife resources on the Amendment No. 1 area. In terms <br />of the some of the comments in the second letter: <br />1. The Amendment No. 1 area is farther than 150' from the low water channel of the S. Platte <br />River, and therefore there will be no disturbance in this identified critical area. <br />2. Except for the two crossings that are already disturbed, there will be no mining within 65' of <br />the east bank of the Fulton Ditch. <br />3. Shorelines may end up irregular, but AI is not committing to any specific shoreline <br />configuration. No islands are proposed, as island would be almost impossible to build given <br />the nature of silt fill material. <br />4. The natural of filling with silt from the wash water plant will probably result is extremely <br />shallow slopes between the created wetlands area and the new lake shoreline, but AI is not <br />committing to any sloping below water line of the lake areas of less than 3H:1 V. <br />5. Native species predominate in al] of the proposed revegeation activities. <br />In summary, mining plan does not adversely impact any critical wildlife resources, and the reclamation <br />plan will enhance and improve the wildlife resources on the property. <br />