Laserfiche WebLink
CIRCES Cost Estimatinst Software <br />PROJECT IDENTIFICATION <br />Task #: 002 <br />Date : 03/23/2007 <br />User : ESC <br />State :Colorado <br />County : Larimer <br />Site :Lyon King Quarry <br />Agency or organization name : DRMS <br />Permit or other job action :Surety Increase <br />Data source : (CRG) <br /> Utilization °k <br />Cost Breakdown : Ownership cost/hour : $58.24 NA <br />OperatingcosUhour : $73.75 100 <br />Ripper op.costJhour : .$0.00 0 <br />Operator cosf/hour : $32.78 NA <br />Total unit cosUhour : $164.77 Total fleet cosUhour : 5164.77 <br /><: <br />_::. <br />MATERIAL QUANTITIES <br />, <br />Initial Swell Loose <br />volume : 800 CCY factor : 1.125 volume : 900 LCY <br />Source of estimated volume :Average 3" of topsoil <br />Source of estimated swell factor :CAT Handbook <br />Average push distance : 200 feet <br />Unadjusted hourly production : 491.9 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 0.00 % (1 <br />Average site altitude : 6,500 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job e~ciency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 0.87 <br />Blade type : 1.00 <br />Net correction : 0.43 <br />Source <br />Decomposed rock - 25% Rock, 75% Earth Adjusted unit production : 212.54 LCY/hr <br />Adjusted fleet production : 212.54 LCY/hr <br />: , <br />_. _ : , <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 4.23 Hours <br />Unit cost : $0.775 /LCY Total job cost : 6898 <br />PermiUjob# : M-1999-064 <br />Abbreviation :none <br />Filename :M084-002 <br />Basic machine : Cat D8R Series ll - 8SU (200: Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 :3-shank dpper <br />