Laserfiche WebLink
<br />• ~ <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman $t., Room 215 <br />Denver, Colorado 80203 <br />Phone: (3031866-3567 <br />FAX: (303) 832.8106 <br />April 10, 1997 <br />RESOURC] <br />Scott Davis <br />Roy Romer <br />Centennial Materials Inc. eovemor <br />c!o Schmid[ Construction Nr„e: s. t«hheae <br />Fxecutive Director <br />2635 Delta Drive ~vtlcnarle.lona <br />Colorado Springs, CO 80910 Divi.fon Direcor <br />RE: Menzer Quarry, Amendment Approval, Perrnlt No, 1Y1.76-004-HR, RevL~ien Nq. <br />AM-3 <br />Dear Mr. Davis: <br />On April 3, 1997 the Division of Minerals and Geology approved the Amendment application <br />submitted to the Division on December 2, 1996, addressing the following: <br />Add 116.5 acres to the permit azea, increase the affected land area by 85.5 acres, correct <br />the legal description, improve the reclamation plan. <br />With the following 3 commitments by Centennial Materials Inc., the terms of the Amendment <br />No. 3 approved by the Division aze hereby incorporated into Permit No. M-76-009-HR. All other <br />conditions and requirements of Permit No. M-76-009-IiR remain in full force and effect. <br />I. Detention sediment basin No. 1 is critical to all stages of both Phases 1 and 2. <br />Construction will be coordinated to be an eazly step in the initial stage of Phase <br />1. Construction of this detention sediment basin can only occur after the south <br />quarry wall is mined back faz enough and the crusher fines stockpile is moved to <br />the north side of the quarry floor. making room for the basin. Centennial <br />Materials will notify the Division when theses two items have been completed. <br />Construction of the basin will be completed within 120 days after the notification. <br />2. The final designs and specifications for the stormwater management facilities on <br />the quarry floor will be submitted to the Division at least 60 days prior to the <br />proposed date for start of construction of each facility. <br />3. The revegatation growth medium, will be a blend of waste rock, fines from the <br />crushing operation and salvaged soil. Testing of various blends of these materials <br />will be conducted to determine the best growth medium. A plan for testing to <br />determine the most suitable growth medium will be submitted to the Division <br />within 120 days of the approval date of this amendment. <br />