My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1990-01-18_REVISION - M1988112 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1990-01-18_REVISION - M1988112 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2021 10:16:32 AM
Creation date
11/21/2007 4:14:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
1/18/1990
Doc Name
SAN LUIS PERMIT AMENDMENT ADEQUACY RESPONSES
From
STEFFEN ROBERTSON & KIRSTEN
To
MLRD
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BATTLE MOUNTAIN RESOURCES, INC. <br />ADEQUACY RESPONSES - ADDITIONAL INFORMATION <br />PAGE 3 OF 7 <br />10. Pease provide a discussion of the QA/QC program to be followed at the San <br />Luis Project as well as a commitment to following the QA/QC program. In <br />addition, all QA/QC test data must be submitted to the Division upon <br />completion for approval of the composite liner construction. BMR must be <br />aware that the Division will require that areas that do nat meet the <br />require specifications as demonstrated by the QA/QC testing ma,y be subject <br />to replacement and retesting. <br />Attachment 1 to this submittal discusses the QA/QC program for the San Luis <br />Project. <br />11. In order to ensure that BMR is aware of all the monitoring requirements <br />for this project, the Division requests that a detailed monitoring report <br />be prepared outlining all monitoring to be performed, the frequencies and <br />reporting requirements. This report should include not only surface and <br />ground water monitoring, but also any other monitoring such as tailings <br />monitoring and pit water inflow monitoring. <br />A comprehensive monitoring report is being prepared for submittal. This <br />report includes a complete discussion of all monitoring required during <br />operation and reclamation of the San Luis Project. Monitoring during <br />construction is discussed in the QA/QC program included as Attachment 1. <br />12. Comments on ]0 and I1 also apply to this question. <br /> No response necessary. <br />13. The comment was satisfactorily addressed in the January 9, 1990 submittal. <br />14. The comment was satisfactorily addressed in the January 9, 1990 submittal. <br />15. The comment was satisfactorily addressed in the January 9, 1990~submittal. <br />16. The comment was satisfactorily addressed in the January 9, 1990 submittal. <br />17. The comment was satisfactorily addressed in the January 9, 1990 submittal. <br />18. The comment was satisfactorily addressed in the January 9, 1990 submittal. <br />19. Please provide a discussion of the riprap method chosen and why this method <br />was chosen. <br />The criteria for the selection of riprap size is the Murray and Smith <br />method presented in the Urban Storm DRainage Criteria Manual (Section <br />5.4.2). The riprap diameter dso is given by the equation <br />dso = ~~So.i~/(SG_l~o.ae x 4.5]z <br />
The URL can be used to link to this page
Your browser does not support the video tag.