My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-06-13_REVISION - M2004009
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2004009
>
2006-06-13_REVISION - M2004009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:49:36 PM
Creation date
11/21/2007 4:12:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004009
IBM Index Class Name
Revision
Doc Date
6/13/2006
Doc Name
Response to Adequacy Review Comments of 8/25/05
From
Asphalt Specialties Co.
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />::: L~1'1'fED POD;DER, i\(~. <br />i>oLIC1' <br />MINPiG ACTi~'1'TiES ADJAC[::~1' TO I;I.E("i'RIC <br />PO«'ER Li~ES <br />In order to eomph• with applicable cod~K and regulations and is cited Power, Inr. safet}• <br />and operational requirements. miniug activities must maintain a minimum of lU' radial <br />clearance front all overhead and underground electric power lines. <br />~o mining e>cavation >hall be allowed within a minimum of I U' of any overhead or undcr- <br />Kround electric power line parullcling a public road or highway or other permanent access. <br />1':~isting grade must be maintained for a minimum of lU' from the electric power line; from <br />that point, a minimum 3:1 slope shall extend to a dutanee of at least 35' from the top of the <br />excavation. <br />\n mining cxcacatian shall be alloµ'cd within u minimum of 3g' of either side of an}• over- <br />head or underground electric power line with miniug activities oa hock sides of the lino ~o <br />cxcasation shall he ulloss•ed within a minimum of 20' o(the point that any overhead electric <br />power line gu}• wire anchor rod enters the ground. <br />Continuous all weather access mast be provided to and parallel to all electric power lines <br />within the area of excavation. A 7U' wide corridor, 35' on either side of the electric poN•er <br />lice, shall be maintained to allow access UI l:nited Power. Inc, to overhead electric power <br />pole.. and lines and to undergtound electric system facilities. <br />The intent of this Policy is to ensure the integrity of the electric power line and provide for <br />all weather access to the tine for maintenance. <br />:111 requests Cor variance to the Policy skull be subject to review and approval of the l:nited <br />Power, Inc. Safer' Director. <br />rclk) minis( Ldp wnf ro Imo 1:05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.