Laserfiche WebLink
<br />STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br />1313 Sherman Street, Room 818 <br />Denver, Colorado 80203 <br />Phone (303) 866-3581 Response to Reclamation Permit Application Consideration <br />FAX (303) 866-3589 <br />ww~vwatecstate.co.us <br />DATE: April 28, 2005 <br />q~/ ~~ <br />~ + <br />a s <br />R60 <br />~ 1876 ~` <br />Bill Owerrs <br />Go~emor <br />a'R 28 2Q05 Director <br />TO: G. Russell Means, Environmental Protection Specialist Division ofplia state tngine~~ PE. <br />arch and Gealog~ <br />CC: Division 5 Office; District 50 Water Commissioner <br />FROM: John Redding, Water Resource Engineer <br />RE: Operator: Moffat Limestone Company, Juniper Quarty, File No. M-1982-141 <br />Section I5, Twp 6N, Rng 95 W, 6th P.M., Moffat County <br />Landowner- United States (BLM) - " - <br />CONDTITONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground water must not <br />occur during or after mining operations. ' <br />^ The proposed operation will consume ground water by ^evaporation, ^dust control, ^reclamation, ^water <br />removed in the mined product, ^pracessing, ^other: <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit or other type <br />of well permit, as applicable. Prior to obtaining a permit, an approved water supply plan or decreed plan for <br />augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and doctunent the <br />locations of all wells within 600 feet mile of the permit azea. The applicant must then obtain a waiver of <br />objection from all well owners with wells within 600 feet of the permit area or contact this office regarding the <br />600 foot spacing notificatiort/hearing process. <br />® The proposed operation may have potential impact on misting water rights neaz the project location. Please <br />provide evidence that the proposed project will not alter or impact the historic operation of existing water rights. <br />^ The applicant has indicated plans to use other water for. <br />® Other. Water stored in udiment ponds must be released to nearest stream system within 72 hours of capture. <br />COMMENTS: - - _ ... <br />