Laserfiche WebLink
Exhibit"E" Reclamation Plan <br /> The finished contours of the previously approved Reclamation Plan for the "Deepe" <br /> Pit have been revised. The most significant feature of the Revised Reclamation <br /> Plan is the reduction in the total number of acres of exposed water surface. The <br /> currently approved Reclamation Plan calls for the construction of five lakes totaling <br /> 38.1 acres of water surface. The Revised Reclamation Plan contains two lakes with <br /> a total of 4.2 acres of exposed water, for a net reduction of 33.9 acres of exposed <br /> water. <br /> The revegetation of the Deepe Pit will be in accordance with the previously <br /> approved Reclamation Plan. Dry land will be seeded with a mixture of native and <br /> introduced grass species as previously submitted to the Division of Minerals and <br /> Geology (DMG). <br />