Laserfiche WebLink
~-OC7`-18-93 MON 87 WATERW ASTE+~L ~D <br />DOUGLAS 0. GIBBS <br />PROJECT ENGINEER, MINING/GEOTECHNICAI DIVISION <br />WATER, WASTE & LAND. INC. <br />EDUCATION <br />M.S. Civil Engineering, Oregon State University, 1987 <br />e,$. Geological Englneedng, New Mexico State University, 1985 <br />REGISTRATION AND MEMBERSHIPS <br />Registered Professional Engineer: Colorado <br />Member, Society of Mining Engineers; American Society of Civil Engineers; <br />Tau Beta Pi. <br />EXPERIENCE <br />P- 0 9 1 0 9 <br />1989 -Present: Project Engineer, Water, Waste & land, Inc. <br />Responsible for geotechnical and hydrological investigation and design of mining <br />related projects. <br />1987-1989: Staff Oeotechnical Engineer, Steffen Robertson and Kirsten, Denver,'Coloredo. <br />Responsible for supervision of field investigations, design analyses and report <br />preparation for three heap leach mining projects and a dam rehabffit~tlon and <br />foundation grouting project. <br />1987: Field Engineer, CH2M Hill and Earth Technology Corporation. <br />Temporary ppsiti0ns as drilling and cone penetrometer supervisor (summer(. <br />1985-19$7: Graduate Teaching and Research Assistant, Oregon State University. <br />1986: Staff Oeotechnlcal Engineer. Fox & Associates (summer). <br />198$-1985: Civil-Geotechnical Engineer, U.S. Forost Service ICooperatlve Education Program <br />with New Mexico State University). <br />s~ENEjiAI j?,/j~ILROUND <br />Mr. Gibbs' experience includes road construction, building foundation investigations, <br />groundwater remediation, dam grouting and rehabilitation and mining related proiectS. Mining <br />related projects inolUde new operations, waste facilities and tailings reclamstion. Work <br />experience includes site selection, field investigation, analysis, design, report andconstruction <br />document preparation. Geotechnicallhydrologicf1eld experience includes supervision of drilling <br />and sampling; monitor well installation, completion and sampling; foundation grouting and <br />tunnel rehabilitation; liner installation; and cone penetration testing. Design dxperience <br />includes tailings disposal, heap leach and reclamation facilities layout and water' balances. <br />Analysis experience includes seismic, PCSTABL and PCSLOPE stability and HE~C-7 and 2. <br />v~. <br />