My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-02-28_REVISION - M1981044
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981044
>
2007-02-28_REVISION - M1981044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:35:53 PM
Creation date
11/21/2007 3:56:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981044
IBM Index Class Name
Revision
Doc Date
2/28/2007
Doc Name
Response to Adequacy Review
From
David Whitehead
To
DRMS
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Solberg Pit <br />Permit M-1981-044; AM-02 <br />Exhibit L <br />Re-Vegitation <br />Cost Summary <br />Fleet Task Unit Direct <br />Task Description Size Hours Cost Cost <br />Rough and Smooth Grade 25 acres 1 85 $185.00 $15,725.00 <br />Apply 6 inches of Top Soil over 25 acres 1 235 $75,00 $17,625.00 <br />Re-Vegitate 25 acres 1 240 $80.00 $19,200.00 <br />MOD /DEMOB 1 10 $190,00 $1,900.00 <br />Total Direct Cost <br />Overhead & Profit <br />Contract Amount <br />Liability Insurance 1.55% <br />Pertormance Bond 1.05% <br />Job Superintendant <br />Profit 10.00% <br />Total O&P <br />Enginerring Work <br />Reclamation Management 5.00% <br />570.00 $54,450.00 <br />$843.98 <br />$571.73 <br />280 $38.00 $10,640.00 <br />$5,445.00 <br />$17, 500.70 <br />$71,950.70 <br />0 $0.00 <br />$3,597.54 <br />Total Indirect Cost $21,098.24 <br />Total Bond Amount $75,548.24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.